2019 Decisions and Findings

Each month, the Certificate of Need Section makes decisions regarding applications under review to either conditionally approve the application or to disapprove it. The Certificate of Need Section also prepares "findings" which explain the basis for the decision.

December 2019

County Project ID Facility FID Project Description Decision Date Decision Findings
Chowan R-011791-19 Edenton Dialysis 955811 Add no more than 4 stations for a total of no more than 19 dialysis stations upon project completion and Project ID #R-11595-18 (relocate 2) 12/23/2019 Conditional Approval Findings
Duplin P-011789-19 Southeastern Dialysis Center - Kenansville 945251 Add no more than 4 stations for a total of no more than 24 stations upon project completion of this project, Project ID# P-11680-19 (add 2 stations) and Project ID# P-11711-19 (relocate entire facility and one station from Wallace Dialysis) which is a change of scope 12/18/2019 Conditional Approval Findings
Durham J-011785-19 Durham Dialysis 955621 Add no more than 5 stations for a total of no more than 22 stations upon project completion 12/10/2019 Conditional Approval Findings
Forsyth G-011796-19 Northside Dialysis Center 000193 Add no more than 3 stations for a total of no more than 45 stations upon completion of this project and Project ID #G-11676-19 (relocate 3 stations to Salem Kidney Center) 12/18/2019 Conditional Approval Findings
Guilford G-011737-19 BMA of South Greensboro 980838 Relocate no more than 10 dialysis stations from BMA Burlington (Alamance County) pursuant to Policy ESRD-2 for a total of no more than 54 stations upon project completion 12/20/2019 Conditional Approval Findings
Guilford G-011744-19 Central Greensboro Dialysis 190319 Develop a new 10-station dialysis facility by relocating no more than 7 stations from Reidsville Dialysis (Rockingham County) and no more than 3 stations from Burlington Dialysis (Alamance County) pursuant to Policy ESRD-2, and develop a home training and support program 12/20/2019 Conditional Approval Findings
Guilford G-011797-19 Triad Dialysis Center 980262 Add no more than 8 stations for a total of no more than 30 stations upon completion of this project and Project ID #G-11672-19 (relocate 5 stations to High Point Kidney Center) 12/18/2019 Conditional Approval Findings
Harnett M-011771-19 FMC Anderson Creek 110803 Add no more than 2 dialysis stations for a total of no more than 16 stations upon project completion 12/31/2019 Conditional Approval Findings
Harnett M-011772-19 Fresenius Medical Care Angier Dialysis 100969 Add no more than 2 dialysis stations for a total of no more than 12 stations upon project completion 12/31/2019 Conditional Approval Findings
Johnston J-011739-19 Fresenius Kidney Care West Johnston 170520 Relocate no more than 2 dialysis stations from Southwest Wake County Dialysis (Wake County) pursuant to Policy ESRD-2 for a total of no more than 12 stations upon completion of this project and Project I.D. #J-11435-17 (develop FKC West Johnston by relocating 10 existing stations from FMC Stallings Station) 12/20/2019 Conditional Approval Findings
Johnston J-011743-19 Clayton Dialysis 170420 Develop a new 10-station dialysis facility by relocating no more than 5 stations from Forest Hills Dialysis (Wilson County) and no more than 5 stations from Wilson Dialysis (Wilson County) 12/20/2019 Conditional Approval Findings
Lenoir P-011768-19 FMC Vernon Dialysis 990324 Add no more than 3 dialysis stations for a total of no more than 27 stations upon project completion 12/17/2019 Conditional Approval Findings
Macon A-011751-19 MH Angel Medical Center, LLLP 190376 Cost overrun for Project ID #A-11427-17 (construct a replacement hospital with no more than 30 acute care beds, three shared operating rooms and one gastrointestinal endoscopy procedure room) 12/30/2019 Conditional Approval Findings
Macon A-011734-19 The Landings of Franklin 190316 Develop a new 70-bed adult care home facility pursuant to the need determination in the 2019 SMFP 12/18/2019 Denied Findings
McDowell C-011794-19 McDowell Dialysis Center 040266 Change of Scope for Project ID #C-11741-19 (relocate entire 17-station facility) by adding no more than 3 dialysis stations for a total of no more than 20 stations upon completion of this project, Project ID #C-11594-18 (add 2 stations), and Project ID #C-11685-19 (add 2 stations) 12/23/2019 Conditional Approval Findings
Mecklenburg F-011775-19 FRESENIUS KIDNEY CARE REGAL OAKS 150024 Add no more than 2 dialysis stations for a total of no more than 17 stations upon project completion 12/7/2019 Conditional Approval Findings
Mecklenburg F-011779-19 FMC Southwest Charlotte 120485 Add no more than 5 dialysis stations for a total of no more than 21 stations upon project completion 12/4/2019 Conditional Approval Findings
Onslow P-011790-19 New River Dialysis 130178 Add no more than 10 dialysis stations for a total of no more than 27 stations upon completion of this project and Project ID# P-11710-19 (relocate 8 stations to Richlands Dialysis) 12/18/2019 Conditional Approval Findings
Pitt Q-011783-19 Greenville Dialysis Center 944657 Add no more than 4 dialysis stations for a total of no more than 51 stations upon project completion 12/18/2019 Conditional Approval Findings
Polk C-011733-19 The Gardens of Columbus 190318 Develop a new 50-bed ACH facility pursuant to the need determination in the 2019 SMFP 12/20/2019 Denied Findings
Rockingham G-011787-19 Dialysis Care of Rockingham Co. 955844 Add no more than 1 dialysis station for a total of no more than 26 stations upon project completion 12/12/2019 Denied Findings
Stokes G-011795-19 King Dialysis Center 020980 Add no more than 7 dialysis stations for a total of no more than 24 stations upon project completion 12/2/2019 Conditional Approval Findings
Vance K-011788-19 Kerr Lake Dialysis 130179 Add no more than 1 dialysis station for a total of no more than 17 stations upon project completion 12/17/2019 Conditional Approval Findings
Wake J-011770-19 BMA of Fuquay Varina Kidney Center 980755 Add no more than 1 dialysis station for a total of no more than 29 stations upon project completion 12/17/2019 Conditional Approval Findings
Wake J-011778-19 Southwest Wake County Dialysis 990968 Add no more than 4 dialysis stations for a total of no more than 30 stations upon completion of this project, Project ID# J-11739-19 (relocate 4 stations to FKC West Johnston), Project ID# J-11661-19 (add 2 stations) and Project ID# J-11510-18 (relocate 2 stations to FKC Holly Springs) 12/17/2019 Conditional Approval Findings

November 2019

County Project ID Facility FID Project Description Decision Date Decision Findings
Alamance G-011786-19 Alamance County Dialysis 140092 Add no more than 3 stations for a total of no more than 13 stations upon project completion 11/8/2019 Conditional Approval Findings
Cumberland M-011763-19 FMC Services of West Fayetteville 011019 Add no more than 4 stations for a total of no more than 40 stations upon completion of this project, Project ID #s M-11502-18 (change of scope for Project ID #M-11286-17 to relocate 5 stations to FKC Rockfish), M-11314-17 (add 5 stations), M-11650-19 (relocate 1 station to FKC Rockfish), M-11662-19 (add 1 station), and M-11740-19 (relocate 4 stations to FKC Rockfish) 11/8/2019 Conditional Approval Findings
Gaston F-011781-19 FMC Gastonia 955615 Add no more than 2 dialysis stations for a total of no more than 39 stations upon project completion 11/4/2019 Conditional Approval Findings
Guilford G-011754-19 Triad Breast Imaging Center 190382 Develop a new diagnostic center including mammography, ultrasound, and dual energy x-ray absorptiometry scan 11/25/2019 Conditional Approval Findings
Guilford G-011745-19 Peters Endoscopy Center 061166 Relocate existing ASF with 2 GI endo rooms from 507 Lindsay St. to 1580 Skeet Club Rd. 11/8/2019 Conditional Approval Findings
Guilford G-011764-19 Fresenius Medical Care High Point 150332 Add no more than 4 dialysis stations for a total of no more than 14 stations upon project completion 11/8/2019 Conditional Approval Findings
Guilford G-011765-19 BMA of Greensboro 945258 Add no more than 7 dialysis stations for a total of no more than 51 stations upon project completion 11/8/2019 Conditional Approval Findings
Johnston J-011762-19 Johnston Health 943290 Relocate six adult psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 for a total of no more than 26 psychiatric beds upon project completion 11/8/2019 Conditional Approval Findings
Wake J-011773-19 Zebulon Kidney Center 970505 Add no more than 2 dialysis stations and relocate no more than 2 stations from Fresenius Medical Care Eastern Wake pursuant to Policy ESRD-2, for a total of no more than 30 stations upon completion of this project and Project ID #J-11540-18 (relocate 4 stations to Johnston Dialysis Center) 11/26/2019 Conditional Approval Findings
Wake J-011766-19 Cary Kidney Center 180166 Add no more than 2 dialysis stations and relocate entire home training program from BMA of Raleigh Dialysis for a total of no more than 26 stations upon completion of this project and Project ID #J-11740-18 (relocate 24-station facility to a new location) 11/8/2019 Conditional Approval Findings
Wake J-011756-19 Raleigh Radiology Cameron Village 190385 Develop a new diagnostic center with one unit each of the following: CT scanner, mammography, bone density, X-ray, and ultrasound 11/4/2019 Conditional Approval Findings

October 2019

County Project ID Facility FID Project Description Decision Date Decision Findings
Buncombe B-011750-19 Mission Hospital 943349 Acquire a third da Vinci Surgical System 10/18/2019 Conditional Approval Findings
Buncombe B-011731-19 Pisgah Villa 190313 Develop a new 30-bed ACH facility pursuant to Policy LTC-1 on the campus of Pisgah Valley Retirement Center, an existing CCRC, for a total of 30 ACH beds, 118 NF beds and 72 ILUs 10/24/2019 Conditional Approval Findings
Durham J-011758-19 Hope Valley Dialysis 180368 Cost overrun for Project I.D. #J-11544-18 (develop a new 10-station dialysis facility) 10/4/2019 Conditional Approval Findings
Johnston J-011746-19 Raleigh Radiology Clayton 070469 Develop a new diagnostic center by replacing an existing digital radiography and fluoroscopy system 10/25/2019 Conditional Approval Findings
Mecklenburg F-011735-19 Aldersgate at Shalom Park 190317 Develop a new 16-bed ACH facility pursuant to Policy LTC-1 as part of a new CCRC. Eight of the 16 ACH beds will be SCU beds 10/1/2019 Conditional Approval Findings
Mecklenburg F-011732-19 The Stewart Health Center 970304 Add 9 NF beds pursuant to Policy NH-2 and 10 ACH beds purusant to Policy LTC-1 for a total of 65 NF beds and 14 ACH beds upon project completion 10/10/2019 Conditional Approval Findings
New Hanover O-011714-19 New Hanover Regional Medical Center 943372 Add no more than 4 shared ORs pursuant to the 2019 SMFP need determination to the main campus of NHRMC for a total of 39 ORs 10/22/2019 Conditional Approval Findings
New Hanover O-011720-19 Wilmington Eye Surgery Center 190277 Develop a freestanding ASF with 2 ORs and 4 procedure rooms pursuant to the 2019 SMFP need determination 10/23/2019 Conditional Approval Findings
Union F-011742-19 Marshville Dialysis 060374 Relocate facility for a total of 16 stations upon project completion of this project and Project ID# F-11490-18 (relocation of 4 stations from Union County Dialysis to Marshville Dialysis Center), and develop a home training program 10/28/2019 Conditional Approval Findings

September 2019

County Project ID Facility FID Project Description Decision Date Decision Findings
Brunswick O-011712-19 Novant Health Brunswick Medical Center 061342 Provide inpatient dialysis services through the lease of no more than two portable inpatient dialysis units upon project completion 9/25/2019 Conditional Approval (PDF, 1.07 MB) Findings (PDF, 175 KB)
Buncombe B-011713-19 Mission Hospital 943349 Add no more than one unit of fixed cardiac catherization equipment pursuant to the need determination in the 2019 SMFP for a total of no more than five cardiac catherization units 9/26/2019 Conditional Approval (PDF, 1.27 MB) Findings (PDF, 194 KB)
Cumberland M-011740-19 Fresenius Kidney Care Rockfish 170017 Relocate no more than 4 stations from FMC Dialysis Services of West Fayetteville pursuant to Policy ESRD-2 for a total of no more than 25 stations upon completion of this project, Project ID# M-11502-18 (change of scope combining Project ID# M-11286-17 and Project ID #M-11344-18 for a 20-staion facility) and Project ID# M-11650-19 (add 1) 9/27/2019 Conditional Approval (PDF, 1.29 MB) Findings (PDF, 354 KB)
Durham J-011718-19 Duke Health Arringdon Radiology 190274 Develop a diagnostic center with new CT, mammography, ultrasound, x-ray, bone density and relocated PedCat scanner, and replaced and relocated MRI scanner 9/16/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 203 KB)
Durham J-011736-19 Fresenius Kidney Care Eno River 170324 Relocate no more than 4 dialysis stations from FMC Dialysis Services of Briggs Avenue pursuant to Policy ESRD-2 for a total of no more than 14 stations upon project completion 9/20/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 221 KB)
Forsyth G-011660-19 The Ivy at Clemmons 920769 Relocate no more than 26 existing ACH beds from Accordius Health at Winston-Salem to The Ivy at Clemmons for a total of no more than 96 ACH beds at The Ivy at Clemmons upon project completion 9/25/2019 Conditional Approval (PDF, 1.36 MB) Findings (PDF, 217 KB)
Forsyth G-011704-19 Accordius Health at Winston Salem 952994 Relocate no more than 26 NF beds from Accordius Health at Clemmons for a total of no more than 66 NF beds and 14 ACH beds at Accordius Health at Winston-Salem upon completion of this project and Project ID# G-11660-19 (relocate 26 ACH beds to The Ivy at Clemmons) 9/25/2019 Conditional Approval (PDF, 1.40 MB) Findings (PDF, 231 KB)
Iredell F-011724-19 Langtree Endoscopy Center 170528 Change of scope for Project ID #F-11443-17 (Develop an ASF with 1 GI-Endo room) for a total of 2 GI-Endo rooms 9/25/2019 Conditional Approval (PDF, 1.43 MB) Findings (PDF, 210 KB)
McDowell C-011741-19 McDowell Dialysis Center 040266 Relocate the entire facility to a new location for a total of no more than 17 stations upon completion of this project, Project ID #C-11594-18 (add 2) and Project ID# C-11685-19 (add 2) 9/27/2019 Conditional Approval (PDF, 1.10 MB) Findings (PDF, 205 KB)
Mecklenburg F-011729-19 The Terrace at Brightmore of South Charlotte 100541 Relocate 4 ACH beds from Radbourne Manor to The Terrace at Brightmore of South Charlotte for a total of no more than 34 ACH beds upon completion of this project, which is a change of scope for Project ID #F-11607-18 (relocate 12 ACH beds from Radbourne Manor to a facility in Mint Hill) 9/27/2019 Conditional Approval (PDF, 1.40 MB) Findings (PDF, 236 KB)
Mecklenburg F-011730-19 The Barclay at SouthPark 170065 Relocate no more than 8 ACH beds from Radborne Manor to The Barclay at Southpark for a total of no more than 22 NF beds and 108 ACH beds, including a 24-bed special care unit, upon completion of this project and Project ID# F-11296-17 (develop a new combination nursing facility with 22 NF and 100 ACH beds). This is also a change of scope for Project ID #F-11607-18 (relocate 12 ACH beds from Radbourne Manor to a facility in Mint Hill) 9/27/2019 Conditional Approval (PDF, 1.33 MB) Findings (PDF, 242 KB)
Orange J-011692-19 Duke Health Orange Ambulatory Surgical Center 190164 Develop a new ambulatory surgical center in Chapel Hill with no more than two operating rooms and two procedure rooms pursuant to the need determination in the 2019 SMFP 9/25/2019 Conditional Approval (PDF, 1.42 MB) Findings (PDF, 508 KB)
Orange J-011695-19 University of North Carolina Hospitals 923517 Develop no more than three operating rooms on the UNC Chapel Hill campus pursuant to the need determination in the 2019 SMFP 9/25/2019 Conditional Approval (PDF, 1.42 MB) Findings (PDF, 508 KB)
Pasquotank R-011726-19 Elizabeth City Health and Rehabilitation 030353 Cost overrun for Project I.D. #R-8766-11 (add 24 nursing facility beds pursuant to the 2011 SMFP need determination for a total of 170 nursing facility beds) 9/18/2019 Conditional Approval (PDF, 1.41 MB) Findings (PDF, 184 KB)
Wake J-011728-19 Raleigh Radiology Knightdale 190281 Develop a new diagnostic center with CT scanner, x-ray, mammography, bone density, and ultrasound 9/13/2019 Conditional Approval (PDF, 1.12 MB) Findings (PDF, 211 KB)
Wake J-011738-19 Fresenius Medical Care White Oak 160405 Relocate no more than four dialysis stations from Wake Dialysis Clinic pursuant to Policy ESRD-2 to FMC White Oak for a total of no more than 16 dialysis stations upon project completion 9/27/2019 Conditional Approval (PDF, 1.06 MB) Findings (PDF, 217 KB)

August 2019

County Project ID Facility FID Project Description Decision Date Decision Findings
Durham J-011708-19 Duke GI at North Durham 190214 Develop a new ambulatory surgical facility with no more than four gastrointestinal endoscopy rooms 8/2/2019 Conditional Approval (PDF, 1.4 MB) Findings (PDF, 230 KB)
Durham J-011717-19 Duke University Hospital 943138 Add no more than 34 acute care beds pursuant to the 2019 SMFP need determination for a total of no more than 1,062 acute care beds upon completion of this project and Project ID# J-11426-17 (add 90) 8/23/2019 Conditional Approval (PDF, 1.3 MB) Findings (PDF, 294 KB)
Forsyth G-011725-19 Wake Forest Baptist Imaging - Kernersville 190280 Develop a diagnostic center by relocating CT and mammography equipment, and adding bone density equipment 8/23/2019 Conditional Approval (PDF, 1.4 MB) Findings (PDF, 425 KB)
Guilford G-011719-19 Wesley Long Community Hospital, Inc. 933540 Replace one existing linear accelerator 8/23/2019 Conditional Approval (PDF, 1.4 MB) Findings (PDF, 243 KB)
Iredell F-011727-19 Iredell Mooresville Campus (ASC) 190282 Develop a freestanding multispecialty ambulatory surgical facility by relocating no more than one operating room from Iredell Memorial Hospital and developing one new procedure room 8/30/2019 Conditional Approval (PDF, 1.7MB) Findings (PDF, 210 KB)
Johnston J-011707-19 Fresenius Medical Care Stallings Station 030941 Relocate entire facility to new location for a total of no more than 18 stations upon completion of this project, Project I.D. #J- 11435-17 (relocate 10 stations), and Project I.D. #J-11473-18 (add four stations) 8/14/2019 Conditional Approval (PDF, 1.2MB) Findings (PDF, 259 KB)
Johnston J-011721-19 Johnston Endoscopy Center 150206 Cost overrun and change of scope for Project I.D. #J- 11033-15 (develop an ambulatory surgical facility with two gastrointestinal endoscopy rooms) involving a change in location and new ownership 8/29/2019 Conditional Approval (PDF, 15 MB) Findings (PDF, 235 KB)
Mecklenburg F-011696-19 Atrium Health Mercy 923352 Change of scope and cost overrun for Project I.D. #F- 11268-16 (renovate existing space related to surgical services and relocate one operating room from Carolinas Medical Center) which involves consolidating surgical services into one location as well as renovating acute care bed rooms and non-clinical areas 8/8/2019 Conditional Approval (PDF, 1.4 MB) Findings (PDF, 321 KB)
Mecklenburg F-011722-19 Atrium Health Kenilworth Diagnostic Center #2 190278 Develop a new diagnostic center in MOB #2 by relocating existing GI, neurology, and urology equipment and adding a fluoroscopy unit, prostate biopsy unit, and two bladder scanners 8/26/2019 Conditional Approval (PDF, 1.4 MB) Findings (PDF, 285 KB)
Mecklenburg F-011723-19 Atrium Health Neurosciences Institute 190284 Relocate hospital-based specialty neurology providers to Atrium Health Kenilworth, a medical campus currently under development in Charlotte 8/30/2019 Conditional Approval (PDF, 1.3 MB) Findings (PDF, 158 KB)
Wake J-011709-19 Duke GI at Green Level 190215 Develop a new ambulatory surgical facility with four GI endoscopy rooms 8/2/2019 Conditional Approval (PDF, 1.3 MB) Findings (PDF, 288 KB)
Wake J-011716-19 Duke Imaging Services at Cary Parkway 190273 Develop a diagnostic center by adding mammography to an existing diagnostic testing facility 8/30/2019 Conditional Approval (PDF, 1.3 MB) Findings (PDF, 148 KB)

July 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Craven P-011701-19 CarolinaEast Medical Center Acquire a 3rd heart lung bypass machine to be used as backup for emergency coverage only 7/25/2019 Conditional Approval (PDF, 1.25 MB) Findings (PDF, 246 KB)
Duplin P-011711-19 Southeastern Dialysis Center - Kenansville Relocate entire facility and relocate one station from Wallace Dialysis for a total of 20 stations upon completion of this project and Project# P-11680-19 (add two stations) 7/25/2019 Conditional Approval (PDF, 1.25 MB) Findings (PDF, 243 KB)
Durham J-011698-19 Liberty Assisted Living of Durham Relocate no more than 29 ACH beds from Ellison's Rest Home and 20 ACH beds from Carver Living Center for a total of no more than 49 ACH beds upon project completion 7/29/2019 Conditional Approval (PDF, 1.48 MB) Findings (PDF, 268 KB)
Hyde R-011699-19 Cross Creek Health Care Add no more than 30 ACH beds pursuant to a need determination in the 2019 SMFP for a total of no more than 50 NF beds and 30 ACH beds upon completion of this project and Project ID# F-11462-18 (relocate 20 NF beds to Charlotte) and Project ID# F-11461-18 (relocate 10 NF beds to Charlotte) 7/12/2019 Conditional Approval (PDF, 1.22 MB) Findings (PDF, 195 KB)
Iredell F-011702-19 Iredell Mooresville Campus Develop a new diagnostic center 7/19/2019 Conditional Approval (PDF, 1.22 MB) Findings (PDF, 295 KB)
Iredell F-011703-19 Mooresville Inpatient Unit Develop a new 10 bed hospice facility in southern Iredell County by relocating no more than 6 inpatient beds from Gordon Hospice House and adding no more than 4 residential beds 7/19/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 205 KB)
Mecklenburg F-011700-19 Atrium Health Kenilworth Diagnostic Center #1 Develop a new diagnostic center in MOB #1 by relocating existing cardiology, vascular, pulmonology, and imaging equipment, including a CT scanner, and adding a diagnostic ultrasound machine, diagnostic x-ray equipment, two echocardiogram machines, and two pulmonary function test machines 7/19/2019 Conditional Approval (PDF, 1.31 MB) Findings (PDF, 284 KB)
Mecklenburg F-011706-19 Carolinas Gastroenterology Center - Kenilworth Relocate the existing ambulatory surgical facility with two gastrointestinal endoscopy rooms and change the name to Carolinas Gastroenterology Center – Kenilworth 7/19/2019 Conditional Approval (PDF, 1.30 MB) Findings (PDF, 221 KB)
Mecklenburg F-011691-19 Novant Health Presbyterian Medical Center Develop an endovascular lab with one interventional angiography system that will not perform cardiac catheterization procedures 7/12/2019 Conditional Approval (PDF, 1.17 MB) Findings (PDF, 137 KB)
Onslow P-011710-19 Richlands Dialysis Develop a new 10-station dialysis facility by relocating eight stations from New River Dialysis and two stations from Southeastern Dialysis Center-Jacksonville 7/25/2019 Conditional Approval (PDF, 1.26 MB) Findings (PDF, 186 KB)
Robeson N-011697-19 Southeastern Regional Medical Center Gibson Cancer Center Acquire a 2nd linear accelerator pursuant to an adjusted need determination in the 2019 SMFP 7/26/2019 Conditional Approval (PDF, 1.30 MB) Findings (PDF, 248 KB)
Wake J-011705-19 Wake Endoscopy Center-Cary Develop a new ambulatory surgical facility with three Gastrointestinal endoscopy rooms 7/19/2019 Conditional Approval (PDF, 1.33 MB) Findings (PDF, 172 KB)
Wake J-011690-19 Duke Health Holly Springs Change of scope for Project ID# J-11616-18 (develop a new diagnostic center) to add additional equipment 7/17/2019 Conditional Approval (PDF, 1.15 MB) Findings (PDF, 99 KB)

June 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Alamance G-011677-19 North Burlington Dialysis Add no more than 2 dialysis stations for a total of no more than 20 stations upon completion of this project, Project ID #G-11603-18 (add 2 stations) and Project ID #G-11289-17 (relocate 6 stations) 6/7/2019 Denied (PDF, 9.63 MB) Findings (PDF, 169 KB)
Catawba E-011667-19 FMC of Catawba Valley Add no more than three dialysis stations for a total of no more than 25 stations upon completion of this project, Project ID #E-11209-16 (relocate six stations to FKC Newton), Project ID #E-11390-17 (add 5 stations), Project ID #E-11480-18 (add one station), and Project ID #E-11649-19 (relocate three stations to FKC Newton) 6/17/2019 Conditional Approval (PDF, 1.07 MB) Findings (PDF, 153 KB)
Cumberland M-011663-19 FMC Dialysis Services South Ramsey Add no more than three dialysis stations and relocate 3 stations from Dunn Kidney Center (Harnett) for a total of no more than 47 stations upon completion of this project, Project ID# M-11286-17 (relocate 5 stations) and Project ID# M-11502-18 (relocate 5 stations 6/28/2019 Conditional Approval (PDF, 1.16 MB) Findings (PDF, 182 KB)
Cumberland M-011662-19 FMC Services of West Fayetteville Add no more than one dialysis station for a total of no more than 40 stations upon completion of this project and Project ID #M-11650-19 (relocate one station) 6/14/2019 Conditional Approval (PDF, 1.05 MB) Findings (PDF, 158 KB)
Duplin P-011680-19 Southeastern Dialysis Center - Kenansville Add no more than 2 dialysis stations for a total of no more than 19 stations 6/14/2019 Conditional Approval (PDF, 1.02 MB) Findings (PDF, 214 KB)
Hoke N-011687-19 Dialysis Care of Hoke County Add no more than 5 dialysis stations for a total of no more than 23 stations upon completion of this project and Project ID# N-11588-18 (relocate 6 stations) 6/7/2019 Conditional Approval (PDF, 9.80 MB) Findings (PDF, 166 KB)
McDowell C-011685-19 McDowell Dialysis Center Add no more than 2 dialysis stations for a total of no more than 17 stations upon completion of this project and Project ID #C-11594-18 (add 2 stations) 6/17/2019 Conditional Approval (PDF, 1011 KB) Findings (PDF, 156 KB)
Mitchell D-011693-19 Mitchell House Add no more than 20 ACH beds for a total of no more than 100 ACH beds pursuant to a need determination in the 2019 SMFP 6/14/2019 Conditional Approval (PDF, 941 KB) Findings (PDF, 166 KB)
Moore H-011694-19 Seven Lakes Assisted Living Acquire and relocate no more than 20 ACH beds from Country Time Inn pursuant to Policy LTC-2 for a total of no more than 80 ACH beds upon project completion 6/7/2019 Conditional Approval (PDF, 10.26 MB) Findings (PDF, 156 KB)
Rowan F-011653-19 The Landings of Salisbury Relocate 106 ACH beds from Kannon Creek Assisted Living, to the replacement facility, The Landings of Salisbury, for a total of no more than 106 ACH beds upon project completion 6/7/2019 Conditional Approval (PDF, 10.27 MB) Findings (PDF, 133 KB)
Wake J-011661-19 Southwest Wake County Dialysis Add no more than two dialysis stations for a total of no more than 30 stations upon completion of this project and Project ID # J-11510-18 (relocate two stations to FKC Holly Springs) 6/21/2019 Conditional Approval (PDF, 1.09 MB) Findings (PDF, 153 KB)
Wake J-011682-19 Wake Forest Dialysis Center Add no more than 3 dialysis stations for a total of no more than 21 stations upon completion of this project, Project ID #J-11131-16 (relocate 10 stations), Project ID #J-11152-16 (add 1 station), Project ID #J-11254-16 (add 2 stations), and Project ID #J-11597-18 (add 3 stations) 6/21/2019 Conditional Approval (PDF, 1.08 MB) Findings (PDF, 185 KB)
Wayne P-011684-19 Mt. Olive Dialysis Add no more than 3 dialysis stations for a total of no more than 20 stations upon completion of this project and Project ID #P-11598-18 (add 2 stations) 6/6/2019 Conditional Approval (PDF, 1021 KB) Findings (PDF, 157 KB)
Wayne P-011683-19 Goldsboro Dialysis Center Add no more than 2 dialysis stations for a total of no more than 25 stations upon completion of this project, Project ID #P-11454-18 (relocate 7 stations), and Project ID #P-11596-18 (add six stations) 6/3/2019 Conditional Approval (PDF, 1014 KB) Findings (PDF, 155 KB)

May 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Anson H-011670-19 FMC of Anson County Add one dialysis station for a total of no more than 18 stations upon project completion 5/10/2019 Conditional Approval (PDF, 1.18 MB) Findings (PDF, 143 KB)
Brunswick O-011679-19 Southeastern Dialysis Center-Shallotte Add no more than one dialysis station for a total of no more than 15 stations upon completion of this project and Project ID # O-11487-18 (add four stations) 5/17/2019 Conditional Approval (PDF, 1.07 MB) Findings (PDF, 169 KB)
Brunswick O-011678-19 Leland Dialysis Add one dialysis station for a total of no more than 12 stations upon completion of this project and Project ID #O-11593-18 (add one station) 5/10/2019 Conditional Approval (PDF, 1.06 MB) Findings (PDF, 155 KB)
Carteret P-011665-19 Crystal Coast Dialysis Unit Add no more than five dialysis stations for a total of no more than 21 stations upon completion of this project and Project ID #P-11538-18 (relocate entire facility) 5/31/2019 Conditional Approval (PDF, 1.18 MB) Findings (PDF, 185 KB)
Davidson G-011674-19 Lexington Dialysis Center Add no more than 1 dialysis station and relocate no more than 4 dialysis stations from Piedmont Dialysis Center for a total of no more than 46 stations upon completion of this project, Project ID #G-11355-17 (replace the existing 37-station facility) and Project ID #G-11639-18 (add 4 stations) 5/21/2019 Conditional Approval (PDF, 1.11 MB) Findings (PDF, 200 KB)
Forsyth G-011676-19 Salem Kidney Center Add no more than one dialysis station and relocate no more than three dialysis stations from Northside Dialysis Center for a total of no more than 51 stations upon completion of this project and Project ID #G-11586-18 (add 2 stations) 5/29/2019 Conditional Approval (PDF, 1.15 MB) Findings (PDF, 182 KB)
Forsyth G-011675-19 Miller Street Dialysis Center of Wake Forest University Add no more than 4 dialysis stations for a total of no more than 48 stations upon project completion 5/20/2019 Conditional Approval (PDF, 1.10 MB) Findings (PDF, 154 KB)
Franklin K-011669-19 Fresenius Kidney Care Tar River Add no more than two dialysis stations for a total of no more than 14 stations upon project completion 5/3/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 201 KB)
Gaston F-011671-19 Fresenius Medical Care Belmont Add no more than three dialysis stations for a total of no more than 19 stations upon completion of this project and Project ID #F-11635-18 (relocate 3 stations) 5/20/2019 Conditional Approval (PDF, 1003 KB) Findings (PDF, 151 KB)
Guilford G-011672-19 High Point Kidney Center Add no more than 2 dialysis stations and relocate 5 stations from Triad Dialysis Center for a total of no more than 48 stations upon completion of this project, Project ID #G-11587-18 (add 7 stations), Project ID #G-11639-18 (relocate 4 stations) and Project ID #G-11651-19 (relocate 3 stations) 5/21/2019 Conditional Approval (PDF, 1.07 MB) Findings (PDF, 210 KB)
Haywood A-011686-19 Waynesville Dialysis Center Add no more than two dialysis stations for a total of no more than 21 stations upon project completion 5/20/2019 Conditional Approval (PDF, 1002 KB) Findings (PDF, 158 KB)
Iredell F-011673-19 Lake Norman Dialysis Center Add 4 dialysis stations for a total of 31 stations 5/16/2019 Conditional Approval (PDF, 1.03 MB) Findings (PDF, 244 KB)
Mecklenburg F-011668-19 BMA OF NORTH CHARLOTTE Add one dialysis station for a total of no more than 40 stations upon completion of this project, Project ID#F-11475-18 (add 1 station), Project ID # F-11400-17 (add 10 stations), Project ID # F-11375-17 (relocate 12 stations) 5/24/2019 Conditional Approval (PDF, 1.04 MB) Findings (PDF, 255 KB)
Mecklenburg F-011666-19 FMC Charlotte Add no more than three dialysis stations for a total of no more than 45 stations upon completion of this project and Project ID# F-11633-18 (relocate three stations) 5/22/2019 Conditional Approval (PDF, 1.03 MB) Findings (PDF, 279 KB)
Mecklenburg F-011658-19 Atrium Health Mountain Island Emergency Department Develop a satellite emergency department with diagnostic and treatment services essential to providing emergency care, including a CT scanner, ultrasound, x-ray, laboratory services and pharmacy services, to be operated as part of Atrium Health University 5/16/2019 Conditional Approval (PDF, 832 KB) Findings (PDF, 286 KB)
Onslow P-011681-19 Southeastern Dialysis Center of Jacksonville Add no more than 5 stations for a total of no more than 38 stations upon completion od this project and Project ID #P-11415-17 (add two stations) 5/3/2019 Conditional Approval (PDF, 1.08 MB) Findings (PDF, 155 KB)
Pender O-011689-19 Southeastern Dialysis Center - Burgaw Add one dialysis station for a total of no more than 19 stations upon project completion 5/17/2019 Conditional Approval (PDF, 1005 KB) Findings (PDF, 230 KB)
Transylvania B-011688-19 Brevard Dialysis Add no more than 2 dialysis stations for a total of no more than 13 stations upon project completion 5/21/2019 Conditional Approval (PDF, 1.08 MB) Findings (PDF, 144 KB)
Union F-011664-19 METROLINA KIDNEY CENTER Add no more than seven dialysis stations for a total of no more than 29 stations upon project completion 5/22/2019 Conditional Approval (PDF, 999 KB) Findings (PDF, 166 KB)
Wake J-011659-19 Rex Hospital Acquire a second fixed dedicated PET scanner pursuant to the need determination in the 2019 SMFP 5/1/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 150 KB)

April 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Caldwell E-011630-18 InSight Health Corp. Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP 4/29/2019 Conditional Approval (PDF, 1.20 MB) Findings (PDF, 702 KB)
Catawba E-011648-19 FMC Hickory Home Program Relocate existing hemodialysis training and support program and its two dialysis stations from FMC Hickory to FMC Hickory Home Program 4/29/2019 Conditional Approval (PDF, 1.02 MB) Findings (PDF, 259 KB)
Chatham J-011656-19 Chatham County Rehabilitation Center Relocate 16 ACH beds from Liberty Commons (Halifax) and 20 ACH beds from Liberty Commons Nursing and Rehab Center (Columbus) to Chatham County Rehabilitation Center for a total of no more than 105 NF beds and 36 ACH beds upon project completion which is a change of scope for Project ID#s J-10168-13 (develop 90 NF beds) and J-11378-17 (COR/Change of scope - relocate only 15 NF beds based on Project ID J-11461-18, not 25) 4/26/2019 Conditional Approval (PDF, 1.45 MB) Findings (PDF, 141 KB)
Davidson G-011639-18 Lexington Dialysis Center Relocate 4 dialysis stations from High Point Kidney Center (Guilford) upon completion of Project ID #G-11355-17 (Replace the existing facility) 4/23/2019 Conditional Approval (PDF, 1.11 MB) Findings (PDF, 425 KB)
Durham J-011631-18 Duke North Pavilion Develop no more than 4 additional ORs pursuant to the need determination in the 2018 SMFP for a total of no more than 69 Ors upon project completion 4/19/2019 Conditional Approval (PDF, 1.35 MB) Findings (PDF, 1.03 MB)
Durham J-011626-18 Southpoint Surgery Center Develop a new ASC with 2 procedure rooms and 4 ORs pursuant to the need determination in the 2018 SMFP 4/9/2019 Denied (PDF, 590 KB) Findings (PDF, 1.03 MB)
Forsyth G-011640-18 Novant Health Forsyth Medical Center Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP 4/29/2019 Denied (PDF, 654 KB) Findings (PDF, 702 KB)
Guilford G-011655-19 LeBauer Endoscopy Center Relocate no more than one GI endo room from Wesley Long Hospital for a total of no more than five GI endo rooms upon project completion 4/30/2019 Conditional Approval (PDF, 1.36 MB) Findings (PDF, 171 KB)
Guilford G-011647-18 Perspective PET Imaging, LLC Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP 4/29/2019 Denied (PDF, 655 KB) Findings (PDF, 702 KB)
Iredell F-011627-18 Mobile Imaging Partners of North Carolina, LLC Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP 4/29/2019 Denied (PDF, 657 KB) Findings (PDF, 702 KB)
Orange J-011644-18 University of North Carolina Hospitals Develop 2 additional ORs pursuant to the need determination in the 2018 SMFP for a total of 42 ORs on the Chapel Hill Campus 4/29/2019 Conditional Approval (PDF, 1.20 MB) Findings (PDF, 1.00 MB)
Orange J-011646-18 University of North Carolina Hospitals-Hillsborough Develop 2 ORs on the Hillsborough Campus pursuant to the 2018 SMFP need determination for a total of 8 ORs on the Hillsborough Campus 4/29/2019 Conditional Approval (PDF, 1.23 MB) Findings (PDF, 1.00 MB)
Orange J-011645-18 North Chapel Hill Surgery Center Develop a new ASC with 2 ORs pursuant to the need determination in the 2018 SFMP 4/29/2019 Conditional Approval (PDF, 1.42 MB) Findings (PDF, 1.00 MB)
Orange J-011632-18 Duke Health Orange Ambulatory Surgical Center Develop a new ambulatory surgical center in Chapel Hill with two operating rooms and two procedure rooms pursuant to the need determination in the 2018 SMFP 4/29/2019 Conditional Approval (PDF, 1.46 MB) Findings (PDF, 1.00 MB)
Rowan F-011628-18 Rowan Endoscopy Center Develop a new ASC with 2 GI endoscopy rooms 4/2/2019 Conditional Approval (PDF, 1.36 MB) Findings (PDF, 144 KB)
Stanly F-011652-19 Trinity Place Cost overrun for Project F-11370-17 (Relocate 17 ACH beds) 4/17/2019 Conditional Approval (PDF, 1.25 MB) Findings (PDF, 96 KB)

March 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Catawba E-011649-19 Fresenius Kidney Care Newton Relocate three stations from FMC of Catawba Valley to FKC Newton for a total of 15 stations at FKC Newton 3/27/2019 Conditional Approval (PDF, 1.16 MB) Findings (PDF, 364 KB)
Cumberland M-011650-19 Fresenius Kidney Care Rockfish Relocate one dialysis station from FMC Services of West Fayetteville to FKC Rockfish for a total of 21 stations at FKC Rockfish 3/29/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 442 KB)
Cumberland M-011634-18 FMC DIALYSIS SERVICES NORTH RAMSEY Relocate 3 dialysis stations from Dunn Kidney Center in Harnett County for a total of 43 stations at FMC Dialysis Services North Ramsey 3/20/2019 Conditional Approval (PDF, 1.22 MB) Findings (PDF, 432 KB)
Davidson G-011651-19 Thomasville Dialysis Center Relocate no more than 3 dialysis stations from High Point Kidney Center (Guilford County) for a total of no more than 35 stations upon project completion 3/11/2019 Conditional Approval (PDF, 1.48 MB) Findings (PDF, 433 KB)
Durham J-011613-18 Duke North Pavilion Renovate and upfit space in North Pavilion to accommodate relocation of Duke Compounding Facility, Clinical Pharmacy, and Hematologic Malignancies clinical services. In addition, renovate space for Adult Bone Marrow Transplant (ABMT) services 3/18/2019 Conditional Approval (PDF, 1.32 MB) Findings (PDF, 402 KB)
Gaston F-011635-18 BMA Kings Mountain Relocate 3 dialysis stations from FMC Belmont to BMA Kings Mountain for a total of 21 stations upon project completion 3/4/2019 Conditional Approval (PDF, 1.13 MB) Findings (PDF, 387 KB)
Mecklenburg F-011607-18 Liberty Commons Nursing & Rehabilitation Center of Mint Hill Relocate 12 ACH beds from Radbourne Manor Village (Project I.D. #F-11052-15) to Liberty Commons Nursing & Rehabilitation Center of Mint Hill (Project I.D. #F-11461-18) for a total of 83 NF beds and 12 ACH beds upon project completion 3/29/2019 Conditional Approval (PDF, 1.30 MB) Findings (PDF, 347 KB)
Mecklenburg F-011619-18 Carolina Center for Specialty Surgery Develop one additional OR pursuant to the 2018 SMFP need determination for a total of no more than 3 ORs upon project completion 3/29/2019 Conditional Approval (PDF, 1.29 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011612-18 Metrolina Vascular Access Care, LLC Develop a new ambulatory surgical facility in Charlotte with one operating room and one procedure room focused on vascular access procedures for patients with end stage renal disease 3/29/2019 Conditional Approval (PDF, 1.51 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011625-18 Novant Health Ballantyne Medical Center Develop a new, separately licensed 36-bed acute care hospital by relocating 36 acute care beds from Novant Health Presbyterian Medical Center, two ORs and one GI Endo room from Novant Health Ballantyne Outpatient Surgery and develop one new dedicated C-Section OR and one new CT scanner 3/29/2019 Conditional Approval (PDF, 1.28 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011622-18 Atrium Health Pineville Add 38 additional acute care beds pursuant to the 2018 SMFP need determination for a total of 259 acute care beds upon completion of this project and Project I.D. # F-11361-17 (add 15 beds) 3/29/2019 Conditional Approval (PDF, 1.34 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011621-18 Atrium Health Pineville Develop one additional OR pursuant to the 2018 SMFP need determination for a total of no more than 13 ORs upon project completion 3/29/2019 Conditional Approval (PDF, 1.25 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011620-18 Carolinas Medical Center Develop no more than two additional ORs pursuant to the 2018 SMFP need determination for a total of no more than 62 ORs upon completion of this project and Project I.D. #F-11106-15 (relocate 2 ORs) 3/29/2019 Conditional Approval (PDF, 1.27 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011624-18 Novant Health Huntersville Medical Center Add 12 acute care beds and one OR pursuant to the 2018 SMFP need determination for a total of 151 acute care beds and 7 ORs upon completion of this project and Project I.D. #F-11110-15 (relocate 48 acute care beds and one OR from Novant Health Presbyterian Medical Center) 3/29/2019 Conditional Approval (PDF, 1.30 MB) Findings (PDF, 1.82 MB)
Mecklenburg F-011633-18 FRESENIUS KIDNEY CARE REGAL OAKS Relocate 3 dialysis stations from FMC Charlotte to FMC Regal Oaks for a total of 15 stations upon completion 3/29/2019 Conditional Approval (PDF, 1.11 MB) Findings (PDF, 364 KB)
Nash L-011611-18 The Landings of Rocky Mount Relocate 60 adult care home beds (including 30 special care unit beds) from The Gardens of Nashville (f/k/a Universal Health Care/Nashville) to a new 60-bed adult care home facility in Rocky Mount 3/26/2019 Conditional Approval (PDF, 1.32 MB) Findings (PDF, 343 KB)
Wake J-011614-18 Personal Home Care of North Carolina Develop a new Medicare-certified home health agency in Wake County pursuant to the Need Determination in the 2018 State Medical Facilities Plan 3/22/2019 Conditional Approval (PDF, 1.24 MB) Findings (PDF, 428 KB)
Wake J-011608-18 The Rosewood Health Center Add 21 NF beds under Policy NH-2, for a total of 57 NF beds upon project completion 3/20/2019 Conditional Approval (PDF, 1.42 MB) Findings (PDF, 437 KB)
Wilkes D-011609-18 The Gardens of Wilkesboro Relocate entire 99 ACH bed facility, Wilkes County Adult Care, and change the name to The Gardens of Wilkesboro 3/8/2019 Conditional Approval (PDF, 9.43 MB) Findings (PDF, 400 KB)
Wilson L-011623-18 Wilson Pines Nursing and Rehabilitation Center Add 13 NF beds by relocating 5 beds from Richmond Pines Nursing & Rehabilitation Center (Richmond), 5 beds from Westwood Hills Nursing & Rehabilitation Center (Wilkes), and 3 beds from Enfield Oaks Nursing & Rehabilitation Center (Halifax) for a total of 17 ACH beds and 108 NF beds upon project completion pursuant to Policy NH-6 3/21/2019 Conditional Approval (PDF, 1.30 MB) Findings (PDF, 436 KB)

February 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Henderson B-011610-18 The Landings of Hendersonville Acquire and relocate 15 ACH beds from Country Meadow Rest Home and 43 ACH beds from The Gardens of the Blue Ridge, pursuant to Policy LTC-2 in the 2018 SMFP, to create a new facility for a total of 58 ACH beds upon project completion 2/26/2019 Conditional Approval (PDF, 1.36 MB) Findings (PDF, 361 KB)
Henderson B-011641-18 Hendersonville Dialysis Center Cost overrun for Project ID #B-11246-16 (add 7 stations) 2/20/2019 Conditional Approval (PDF, 1.03 MB) Findings (PDF, 340 KB)
Mecklenburg F-011566-18 Carolinas Rehabilitation Develop 8 new inpatient rehabilitation beds pursuant to the 2018 SMFP need determination for a total of 78 beds upon project completion 2/27/2019 Denied (PDF, 594 KB) Findings (PDF, 636 KB)
Mecklenburg F-011584-18 Novant Health Presbyterian Medical Center Develop a 10-bed inpatient rehabilitation unit by developing the 8 beds in the 2018 SMFP need determination and relocating 2 existing rehab beds from Novant Health Rowan Medical Center 2/27/2019 Conditional Approval (PDF, 1.22 MB) Findings (PDF, 636 KB)
Pitt Q-011636-18 FMC Farmville Relocate 4 dialysis stations from Greenville Dialysis Center for a total of 14 stations upon completion 2/20/2019 Conditional Approval (PDF, 1.20 MB) Findings (PDF, 344 KB)
Richmond H-011629-18 FirstHealth Moore Regional Hospital - Richmond Relocate existing MRI scanner from Hamlet to Richmond 2/1/2019 Conditional Approval (PDF, 1.28 MB) Findings (PDF, 353 KB)
Union F-011618-18 Atrium Health Union West Develop a new satellite campus of CHS Union by relocating 40 acute care beds, two ORs, one dedicated C-Section OR, one GI endoscopy room, and one CT scanner from CHS Union 2/12/2019 Conditional Approval (PDF, 1.33 MB) Findings (PDF, 978 KB)
Wake J-011572-18 FMC New Hope Dialysis Add 8 dialysis stations for a total of 36 stations upon completion of this project, Project I.D. # J-11271-16 (relocate 6 stations to FMC Rock Quarry), Project I.D.# J-11312-17 (add 6 stations), Project I.D. # J-11372-17 (relocate 4 stations to FKC Selma) and Project I.D. # J-11510-18 (relocate 4 stations to FKC Holly Springs) 2/27/2019 Conditional Approval (PDF, 1.18 MB) Findings (PDF, 529 KB)
Wake J-011575-18 BMA of Raleigh Add no more than four stations for a total of no more than 50 stations upon completion of this project and Project I.D. # J-11510-18 (relocate 4 stations to FKC Holly Springs) 2/12/2019 Conditional Approval (PDF, 1.05 MB) Findings (PDF, 321 KB)
Wayne P-011581-18 RAI Care Centers - Goldsboro Add no more than three dialysis stations for a total of no more than 21 stations upon completion of this project, Project I.D. # P-11346-17 (relocate entire facility to a new location), and Project I.D. # P-11477-18 (add 2 stations) 2/15/2019 Conditional Approval (PDF, 1.25 MB) Findings (PDF, 354 KB)
Wayne P-011596-18 Goldsboro Dialysis Center Add no more than 6 stations for a total of no more than 23 stations upon completion of this project and Project I.D. # P-11451-18 (relocate 7 stations to Rosewood Dialysis) 2/15/2019 Conditional Approval (PDF, 1.11 MB) Findings (PDF, 347 KB)

January 2019

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Brunswick O-011593-18 Leland Dialysis Add 1 station for a total of 11 stations 1/14/2019 Conditional Approval (PDF, 1.06 MB) Findings (PDF, 410 KB)
Caldwell E-011569-18 BMA Lenoir Add one station for a total of 42 stations upon completion of this project and the following projects: Project ID # E-11528-18 (change of scope); Project ID # E-11401-17 (add seven stations); and Project ID # E-11377-17 (relocate BMA Lenoir) 1/10/2019 Conditional Approval (PDF, 1.25 MB) Findings (PDF, 429 KB)
Catawba E-011570-18 Fresenius Medical Care of Hickory Add two stations for a total 35 stations upon completion of this project, Project I.D. # E-11485-18 (add 4 stations) and Project I.D. # E-11209-16 (relocate 6 stations to FKC Newton) 1/17/2019 Conditional Approval (PDF, 1.08 MB) Findings (PDF, 431 KB)
Edgecombe L-011580-18 BMA EAST ROCKY MOUNT Add 2 stations for a total of 26 stations upon completion of this project, Project ID # L-11374-17 (relocate 10 stations to FMC Boice-Willis) and Project ID # L-11483-18 (add 4 stations) 1/9/2019 Conditional Approval (PDF, 1.24 MB) Findings (PDF, 408 KB)
Guilford G-011587-18 High Point Kidney Center Add 7 dialysis stations for a total of 48 stations 1/7/2019 Conditional Approval (PDF, 1.20 MB) Findings (PDF, 416 KB)
Lee J-011578-18 Carolina Dialysis - Sanford Relocate entire facility and add 6 stations for a total of 39 1/11/2019 Conditional Approval (PDF, 1.21 MB) Findings (PDF, 375 KB)
Mecklenburg F-011637-18 INS Charlotte Relocate 2 dialysis stations from BMA Beatties Ford 1/14/2019 Conditional Approval (PDF, 660 KB) Findings (PDF, 450 KB)
Mecklenburg F-011638-18 INS-HUNTERSVILLE Relocate 2 dialysis stations from BMA Beatties Ford 1/14/2019 Conditional Approval (PDF, 1.06 MB) Findings (PDF, 442 KB)
Mecklenburg F-011590-18 Mountain Island Lake Dialysis Develop a new 10-station dialysis facility by relocating 10 stations from North Charlotte Dialysis 1/7/2019 Conditional Approval (PDF, 1.45 MB) Findings (PDF, 498 KB)
Moore H-011643-18 Pinehurst Home Training Develop a new kidney disease treatment center to provide home peritoneal dialysis training and support services by relocating the existing PD program from Dialysis Care of Moore County 1/25/2019 Conditional Approval (PDF, 1.13 MB) Findings (PDF, 380 KB)
New Hanover O-011642-18 Wrightsville Beach Dialysis Develop a new 10-station facility by relocating 8 stations from Cape Fear Dialysis and 2 stations from Southeastern Dialysis Center - Wilmington 1/7/2019 Conditional Approval (PDF, 1.27 MB) Findings (PDF, 452 KB)
Wake J-011615-18 Well Care Home Health Develop a new Medicare-certified home health agency in Wake County pursuant to the 2018 SMFP need determination 1/29/2019 Conditional Approval (PDF, 1.22 MB) Findings (PDF, 521 KB)
Wake J-011551-18 RAC Surgery Center, LLC Develop a new ASC with one OR and two procedure rooms for vascular access procedures for ESRD patients pursuant to a need determination in the 2018 SMFP 1/28/2019 Conditional Approval (PDF, 1.64 MB) Findings (PDF, 1.90 MB)
Wake J-011553-18 Rex Surgery Center of Garner Develop a new ASC in Garner with two ORs pursuant to the need determination in 2018 SMFP 1/28/2019 Denied (PDF, 643 KB) Findings (PDF, 1.90 MB)
Wake J-011554-18 UNC Health Care Panther Creek Ambulatory Surgery Center Develop a freestanding ASC by developing two ORs pursuant to the need determination in 2018 SMFP 1/28/2019 Denied (PDF, 653 KB) Findings (PDF, 1.90 MB)
Wake J-011557-18 Green Level Ambulatory Surgical Center Develop a new ambulatory surgical center with four ORs pursuant to a need determination in the 2018 SMFP 1/28/2019 Denied (PDF, 642 KB) Findings (PDF, 1.90 MB)
Wake J-011555-18 Rex Hospital Add two ORs pursuant to the need determination in the 2018 SMFP 1/28/2019 Denied (PDF, 638 KB) Findings (PDF, 1.90 MB)
Wake J-011561-18 Ortho NC ASC Develop a new ASC with one OR and one procedure room pursuant to a need determination in the 2018 SMFP 1/28/2019 Conditional Approval (PDF, 1.56 MB) Findings (PDF, 1.90 MB)
Wake J-011565-18 WakeMed Surgery Center-Cary Develop a new ASC with 2 ORs in Cary pursuant to the need determination in the 2018 SMFP 1/28/2019 Denied (PDF, 640 KB) Findings (PDF, 1.90 MB)
Wake J-011564-18 WakeMed Surgery Center-North Raleigh Develop a new ASC with two ORs and two procedure rooms pursuant to a need determination in the 2018 SMFP 1/28/2019 Denied (PDF, 636 KB) Findings (PDF, 1.90 MB)
Wake J-011616-18 Duke Health Holly Springs Develop a new diagnostic center 1/14/2019 Conditional Approval (PDF, 1.07 MB) Findings (PDF, 500 KB)
Wake J-011617-18 Duke Health Center Apex Develop a new diagnostic center 1/14/2019 Conditional Approval (PDF, 1.19 MB) Findings (PDF, 459 KB)
Wake J-011597-18 Wake Forest Dialysis Center Add 3 stations for a total of 18 stations upon completion of this project, Project I.D. #J-11131-16 (relocate 10 stations to Oak City Dialysis), Project I.D. #J-11152-16 (add 1 station), and Project I.D. #J-11254-16 (add 2 stations) 1/7/2019 Conditional Approval (PDF, 1.17 MB) Findings (PDF, 412 KB)
Washington R-011576-18 FMC Dialysis Services of Plymouth Add two stations for a total of 16 stations 1/18/2019 Conditional Approval (PDF, 1.10 MB) Findings (PDF, 407 KB)
Wayne P-011598-18 Mt. Olive Dialysis Add 2 stations for a total of 17 stations 1/3/2019 Conditional Approval (PDF, 1.18 MB) Findings (PDF, 418 KB)