Chowan | R-011791-19 | Edenton Dialysis | 955811 | Add no more than 4 stations for a total of no more than 19 dialysis stations upon project completion and Project ID #R-11595-18 (relocate 2) | 12/23/2019 | Conditional Approval | Findings |
Duplin | P-011789-19 | Southeastern Dialysis Center - Kenansville | 945251 | Add no more than 4 stations for a total of no more than 24 stations upon project completion of this project, Project ID# P-11680-19 (add 2 stations) and Project ID# P-11711-19 (relocate entire facility and one station from Wallace Dialysis) which is a change of scope | 12/18/2019 | Conditional Approval | Findings |
Durham | J-011785-19 | Durham Dialysis | 955621 | Add no more than 5 stations for a total of no more than 22 stations upon project completion | 12/10/2019 | Conditional Approval | Findings |
Forsyth | G-011796-19 | Northside Dialysis Center | 000193 | Add no more than 3 stations for a total of no more than 45 stations upon completion of this project and Project ID #G-11676-19 (relocate 3 stations to Salem Kidney Center) | 12/18/2019 | Conditional Approval | Findings |
Guilford | G-011737-19 | BMA of South Greensboro | 980838 | Relocate no more than 10 dialysis stations from BMA Burlington (Alamance County) pursuant to Policy ESRD-2 for a total of no more than 54 stations upon project completion | 12/20/2019 | Conditional Approval | Findings |
Guilford | G-011744-19 | Central Greensboro Dialysis | 190319 | Develop a new 10-station dialysis facility by relocating no more than 7 stations from Reidsville Dialysis (Rockingham County) and no more than 3 stations from Burlington Dialysis (Alamance County) pursuant to Policy ESRD-2, and develop a home training and support program | 12/20/2019 | Conditional Approval | Findings |
Guilford | G-011797-19 | Triad Dialysis Center | 980262 | Add no more than 8 stations for a total of no more than 30 stations upon completion of this project and Project ID #G-11672-19 (relocate 5 stations to High Point Kidney Center) | 12/18/2019 | Conditional Approval | Findings |
Harnett | M-011771-19 | FMC Anderson Creek | 110803 | Add no more than 2 dialysis stations for a total of no more than 16 stations upon project completion | 12/31/2019 | Conditional Approval | Findings |
Harnett | M-011772-19 | Fresenius Medical Care Angier Dialysis | 100969 | Add no more than 2 dialysis stations for a total of no more than 12 stations upon project completion | 12/31/2019 | Conditional Approval | Findings |
Johnston | J-011739-19 | Fresenius Kidney Care West Johnston | 170520 | Relocate no more than 2 dialysis stations from Southwest Wake County Dialysis (Wake County) pursuant to Policy ESRD-2 for a total of no more than 12 stations upon completion of this project and Project I.D. #J-11435-17 (develop FKC West Johnston by relocating 10 existing stations from FMC Stallings Station) | 12/20/2019 | Conditional Approval | Findings |
Johnston | J-011743-19 | Clayton Dialysis | 170420 | Develop a new 10-station dialysis facility by relocating no more than 5 stations from Forest Hills Dialysis (Wilson County) and no more than 5 stations from Wilson Dialysis (Wilson County) | 12/20/2019 | Conditional Approval | Findings |
Lenoir | P-011768-19 | FMC Vernon Dialysis | 990324 | Add no more than 3 dialysis stations for a total of no more than 27 stations upon project completion | 12/17/2019 | Conditional Approval | Findings |
Macon | A-011751-19 | MH Angel Medical Center, LLLP | 190376 | Cost overrun for Project ID #A-11427-17 (construct a replacement hospital with no more than 30 acute care beds, three shared operating rooms and one gastrointestinal endoscopy procedure room) | 12/30/2019 | Conditional Approval | Findings |
Macon | A-011734-19 | The Landings of Franklin | 190316 | Develop a new 70-bed adult care home facility pursuant to the need determination in the 2019 SMFP | 12/18/2019 | Denied | Findings |
McDowell | C-011794-19 | McDowell Dialysis Center | 040266 | Change of Scope for Project ID #C-11741-19 (relocate entire 17-station facility) by adding no more than 3 dialysis stations for a total of no more than 20 stations upon completion of this project, Project ID #C-11594-18 (add 2 stations), and Project ID #C-11685-19 (add 2 stations) | 12/23/2019 | Conditional Approval | Findings |
Mecklenburg | F-011775-19 | FRESENIUS KIDNEY CARE REGAL OAKS | 150024 | Add no more than 2 dialysis stations for a total of no more than 17 stations upon project completion | 12/7/2019 | Conditional Approval | Findings |
Mecklenburg | F-011779-19 | FMC Southwest Charlotte | 120485 | Add no more than 5 dialysis stations for a total of no more than 21 stations upon project completion | 12/4/2019 | Conditional Approval | Findings |
Onslow | P-011790-19 | New River Dialysis | 130178 | Add no more than 10 dialysis stations for a total of no more than 27 stations upon completion of this project and Project ID# P-11710-19 (relocate 8 stations to Richlands Dialysis) | 12/18/2019 | Conditional Approval | Findings |
Pitt | Q-011783-19 | Greenville Dialysis Center | 944657 | Add no more than 4 dialysis stations for a total of no more than 51 stations upon project completion | 12/18/2019 | Conditional Approval | Findings |
Polk | C-011733-19 | The Gardens of Columbus | 190318 | Develop a new 50-bed ACH facility pursuant to the need determination in the 2019 SMFP | 12/20/2019 | Denied | Findings |
Rockingham | G-011787-19 | Dialysis Care of Rockingham Co. | 955844 | Add no more than 1 dialysis station for a total of no more than 26 stations upon project completion | 12/12/2019 | Denied | Findings |
Stokes | G-011795-19 | King Dialysis Center | 020980 | Add no more than 7 dialysis stations for a total of no more than 24 stations upon project completion | 12/2/2019 | Conditional Approval | Findings |
Vance | K-011788-19 | Kerr Lake Dialysis | 130179 | Add no more than 1 dialysis station for a total of no more than 17 stations upon project completion | 12/17/2019 | Conditional Approval | Findings |
Wake | J-011770-19 | BMA of Fuquay Varina Kidney Center | 980755 | Add no more than 1 dialysis station for a total of no more than 29 stations upon project completion | 12/17/2019 | Conditional Approval | Findings |
Wake | J-011778-19 | Southwest Wake County Dialysis | 990968 | Add no more than 4 dialysis stations for a total of no more than 30 stations upon completion of this project, Project ID# J-11739-19 (relocate 4 stations to FKC West Johnston), Project ID# J-11661-19 (add 2 stations) and Project ID# J-11510-18 (relocate 2 stations to FKC Holly Springs) | 12/17/2019 | Conditional Approval | Findings |
November 2019
County | Project ID | Facility | FID | Project Description | Decision Date | Decision | Findings |
---|---|---|---|---|---|---|---|
Alamance | G-011786-19 | Alamance County Dialysis | 140092 | Add no more than 3 stations for a total of no more than 13 stations upon project completion | 11/8/2019 | Conditional Approval | Findings |
Cumberland | M-011763-19 | FMC Services of West Fayetteville | 011019 | Add no more than 4 stations for a total of no more than 40 stations upon completion of this project, Project ID #s M-11502-18 (change of scope for Project ID #M-11286-17 to relocate 5 stations to FKC Rockfish), M-11314-17 (add 5 stations), M-11650-19 (relocate 1 station to FKC Rockfish), M-11662-19 (add 1 station), and M-11740-19 (relocate 4 stations to FKC Rockfish) | 11/8/2019 | Conditional Approval | Findings |
Gaston | F-011781-19 | FMC Gastonia | 955615 | Add no more than 2 dialysis stations for a total of no more than 39 stations upon project completion | 11/4/2019 | Conditional Approval | Findings |
Guilford | G-011754-19 | Triad Breast Imaging Center | 190382 | Develop a new diagnostic center including mammography, ultrasound, and dual energy x-ray absorptiometry scan | 11/25/2019 | Conditional Approval | Findings |
Guilford | G-011745-19 | Peters Endoscopy Center | 061166 | Relocate existing ASF with 2 GI endo rooms from 507 Lindsay St. to 1580 Skeet Club Rd. | 11/8/2019 | Conditional Approval | Findings |
Guilford | G-011764-19 | Fresenius Medical Care High Point | 150332 | Add no more than 4 dialysis stations for a total of no more than 14 stations upon project completion | 11/8/2019 | Conditional Approval | Findings |
Guilford | G-011765-19 | BMA of Greensboro | 945258 | Add no more than 7 dialysis stations for a total of no more than 51 stations upon project completion | 11/8/2019 | Conditional Approval | Findings |
Johnston | J-011762-19 | Johnston Health | 943290 | Relocate six adult psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 for a total of no more than 26 psychiatric beds upon project completion | 11/8/2019 | Conditional Approval | Findings |
Wake | J-011773-19 | Zebulon Kidney Center | 970505 | Add no more than 2 dialysis stations and relocate no more than 2 stations from Fresenius Medical Care Eastern Wake pursuant to Policy ESRD-2, for a total of no more than 30 stations upon completion of this project and Project ID #J-11540-18 (relocate 4 stations to Johnston Dialysis Center) | 11/26/2019 | Conditional Approval | Findings |
Wake | J-011766-19 | Cary Kidney Center | 180166 | Add no more than 2 dialysis stations and relocate entire home training program from BMA of Raleigh Dialysis for a total of no more than 26 stations upon completion of this project and Project ID #J-11740-18 (relocate 24-station facility to a new location) | 11/8/2019 | Conditional Approval | Findings |
Wake | J-011756-19 | Raleigh Radiology Cameron Village | 190385 | Develop a new diagnostic center with one unit each of the following: CT scanner, mammography, bone density, X-ray, and ultrasound | 11/4/2019 | Conditional Approval | Findings |
October 2019
County | Project ID | Facility | FID | Project Description | Decision Date | Decision | Findings |
---|---|---|---|---|---|---|---|
Buncombe | B-011750-19 | Mission Hospital | 943349 | Acquire a third da Vinci Surgical System | 10/18/2019 | Conditional Approval | Findings |
Buncombe | B-011731-19 | Pisgah Villa | 190313 | Develop a new 30-bed ACH facility pursuant to Policy LTC-1 on the campus of Pisgah Valley Retirement Center, an existing CCRC, for a total of 30 ACH beds, 118 NF beds and 72 ILUs | 10/24/2019 | Conditional Approval | Findings |
Durham | J-011758-19 | Hope Valley Dialysis | 180368 | Cost overrun for Project I.D. #J-11544-18 (develop a new 10-station dialysis facility) | 10/4/2019 | Conditional Approval | Findings |
Johnston | J-011746-19 | Raleigh Radiology Clayton | 070469 | Develop a new diagnostic center by replacing an existing digital radiography and fluoroscopy system | 10/25/2019 | Conditional Approval | Findings |
Mecklenburg | F-011735-19 | Aldersgate at Shalom Park | 190317 | Develop a new 16-bed ACH facility pursuant to Policy LTC-1 as part of a new CCRC. Eight of the 16 ACH beds will be SCU beds | 10/1/2019 | Conditional Approval | Findings |
Mecklenburg | F-011732-19 | The Stewart Health Center | 970304 | Add 9 NF beds pursuant to Policy NH-2 and 10 ACH beds purusant to Policy LTC-1 for a total of 65 NF beds and 14 ACH beds upon project completion | 10/10/2019 | Conditional Approval | Findings |
New Hanover | O-011714-19 | New Hanover Regional Medical Center | 943372 | Add no more than 4 shared ORs pursuant to the 2019 SMFP need determination to the main campus of NHRMC for a total of 39 ORs | 10/22/2019 | Conditional Approval | Findings |
New Hanover | O-011720-19 | Wilmington Eye Surgery Center | 190277 | Develop a freestanding ASF with 2 ORs and 4 procedure rooms pursuant to the 2019 SMFP need determination | 10/23/2019 | Conditional Approval | Findings |
Union | F-011742-19 | Marshville Dialysis | 060374 | Relocate facility for a total of 16 stations upon project completion of this project and Project ID# F-11490-18 (relocation of 4 stations from Union County Dialysis to Marshville Dialysis Center), and develop a home training program | 10/28/2019 | Conditional Approval | Findings |
County | Project ID | Facility | FID | Project Description | Decision Date | Decision | Findings |
---|---|---|---|---|---|---|---|
Brunswick | O-011712-19 | Novant Health Brunswick Medical Center | 061342 | Provide inpatient dialysis services through the lease of no more than two portable inpatient dialysis units upon project completion | 9/25/2019 | Conditional Approval (PDF, 1.07 MB) | Findings (PDF, 175 KB) |
Buncombe | B-011713-19 | Mission Hospital | 943349 | Add no more than one unit of fixed cardiac catherization equipment pursuant to the need determination in the 2019 SMFP for a total of no more than five cardiac catherization units | 9/26/2019 | Conditional Approval (PDF, 1.27 MB) | Findings (PDF, 194 KB) |
Cumberland | M-011740-19 | Fresenius Kidney Care Rockfish | 170017 | Relocate no more than 4 stations from FMC Dialysis Services of West Fayetteville pursuant to Policy ESRD-2 for a total of no more than 25 stations upon completion of this project, Project ID# M-11502-18 (change of scope combining Project ID# M-11286-17 and Project ID #M-11344-18 for a 20-staion facility) and Project ID# M-11650-19 (add 1) | 9/27/2019 | Conditional Approval (PDF, 1.29 MB) | Findings (PDF, 354 KB) |
Durham | J-011718-19 | Duke Health Arringdon Radiology | 190274 | Develop a diagnostic center with new CT, mammography, ultrasound, x-ray, bone density and relocated PedCat scanner, and replaced and relocated MRI scanner | 9/16/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 203 KB) |
Durham | J-011736-19 | Fresenius Kidney Care Eno River | 170324 | Relocate no more than 4 dialysis stations from FMC Dialysis Services of Briggs Avenue pursuant to Policy ESRD-2 for a total of no more than 14 stations upon project completion | 9/20/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 221 KB) |
Forsyth | G-011660-19 | The Ivy at Clemmons | 920769 | Relocate no more than 26 existing ACH beds from Accordius Health at Winston-Salem to The Ivy at Clemmons for a total of no more than 96 ACH beds at The Ivy at Clemmons upon project completion | 9/25/2019 | Conditional Approval (PDF, 1.36 MB) | Findings (PDF, 217 KB) |
Forsyth | G-011704-19 | Accordius Health at Winston Salem | 952994 | Relocate no more than 26 NF beds from Accordius Health at Clemmons for a total of no more than 66 NF beds and 14 ACH beds at Accordius Health at Winston-Salem upon completion of this project and Project ID# G-11660-19 (relocate 26 ACH beds to The Ivy at Clemmons) | 9/25/2019 | Conditional Approval (PDF, 1.40 MB) | Findings (PDF, 231 KB) |
Iredell | F-011724-19 | Langtree Endoscopy Center | 170528 | Change of scope for Project ID #F-11443-17 (Develop an ASF with 1 GI-Endo room) for a total of 2 GI-Endo rooms | 9/25/2019 | Conditional Approval (PDF, 1.43 MB) | Findings (PDF, 210 KB) |
McDowell | C-011741-19 | McDowell Dialysis Center | 040266 | Relocate the entire facility to a new location for a total of no more than 17 stations upon completion of this project, Project ID #C-11594-18 (add 2) and Project ID# C-11685-19 (add 2) | 9/27/2019 | Conditional Approval (PDF, 1.10 MB) | Findings (PDF, 205 KB) |
Mecklenburg | F-011729-19 | The Terrace at Brightmore of South Charlotte | 100541 | Relocate 4 ACH beds from Radbourne Manor to The Terrace at Brightmore of South Charlotte for a total of no more than 34 ACH beds upon completion of this project, which is a change of scope for Project ID #F-11607-18 (relocate 12 ACH beds from Radbourne Manor to a facility in Mint Hill) | 9/27/2019 | Conditional Approval (PDF, 1.40 MB) | Findings (PDF, 236 KB) |
Mecklenburg | F-011730-19 | The Barclay at SouthPark | 170065 | Relocate no more than 8 ACH beds from Radborne Manor to The Barclay at Southpark for a total of no more than 22 NF beds and 108 ACH beds, including a 24-bed special care unit, upon completion of this project and Project ID# F-11296-17 (develop a new combination nursing facility with 22 NF and 100 ACH beds). This is also a change of scope for Project ID #F-11607-18 (relocate 12 ACH beds from Radbourne Manor to a facility in Mint Hill) | 9/27/2019 | Conditional Approval (PDF, 1.33 MB) | Findings (PDF, 242 KB) |
Orange | J-011692-19 | Duke Health Orange Ambulatory Surgical Center | 190164 | Develop a new ambulatory surgical center in Chapel Hill with no more than two operating rooms and two procedure rooms pursuant to the need determination in the 2019 SMFP | 9/25/2019 | Conditional Approval (PDF, 1.42 MB) | Findings (PDF, 508 KB) |
Orange | J-011695-19 | University of North Carolina Hospitals | 923517 | Develop no more than three operating rooms on the UNC Chapel Hill campus pursuant to the need determination in the 2019 SMFP | 9/25/2019 | Conditional Approval (PDF, 1.42 MB) | Findings (PDF, 508 KB) |
Pasquotank | R-011726-19 | Elizabeth City Health and Rehabilitation | 030353 | Cost overrun for Project I.D. #R-8766-11 (add 24 nursing facility beds pursuant to the 2011 SMFP need determination for a total of 170 nursing facility beds) | 9/18/2019 | Conditional Approval (PDF, 1.41 MB) | Findings (PDF, 184 KB) |
Wake | J-011728-19 | Raleigh Radiology Knightdale | 190281 | Develop a new diagnostic center with CT scanner, x-ray, mammography, bone density, and ultrasound | 9/13/2019 | Conditional Approval (PDF, 1.12 MB) | Findings (PDF, 211 KB) |
Wake | J-011738-19 | Fresenius Medical Care White Oak | 160405 | Relocate no more than four dialysis stations from Wake Dialysis Clinic pursuant to Policy ESRD-2 to FMC White Oak for a total of no more than 16 dialysis stations upon project completion | 9/27/2019 | Conditional Approval (PDF, 1.06 MB) | Findings (PDF, 217 KB) |
County | Project ID | Facility | FID | Project Description | Decision Date | Decision | Findings |
---|---|---|---|---|---|---|---|
Durham | J-011708-19 | Duke GI at North Durham | 190214 | Develop a new ambulatory surgical facility with no more than four gastrointestinal endoscopy rooms | 8/2/2019 | Conditional Approval (PDF, 1.4 MB) | Findings (PDF, 230 KB) |
Durham | J-011717-19 | Duke University Hospital | 943138 | Add no more than 34 acute care beds pursuant to the 2019 SMFP need determination for a total of no more than 1,062 acute care beds upon completion of this project and Project ID# J-11426-17 (add 90) | 8/23/2019 | Conditional Approval (PDF, 1.3 MB) | Findings (PDF, 294 KB) |
Forsyth | G-011725-19 | Wake Forest Baptist Imaging - Kernersville | 190280 | Develop a diagnostic center by relocating CT and mammography equipment, and adding bone density equipment | 8/23/2019 | Conditional Approval (PDF, 1.4 MB) | Findings (PDF, 425 KB) |
Guilford | G-011719-19 | Wesley Long Community Hospital, Inc. | 933540 | Replace one existing linear accelerator | 8/23/2019 | Conditional Approval (PDF, 1.4 MB) | Findings (PDF, 243 KB) |
Iredell | F-011727-19 | Iredell Mooresville Campus (ASC) | 190282 | Develop a freestanding multispecialty ambulatory surgical facility by relocating no more than one operating room from Iredell Memorial Hospital and developing one new procedure room | 8/30/2019 | Conditional Approval (PDF, 1.7MB) | Findings (PDF, 210 KB) |
Johnston | J-011707-19 | Fresenius Medical Care Stallings Station | 030941 | Relocate entire facility to new location for a total of no more than 18 stations upon completion of this project, Project I.D. #J- 11435-17 (relocate 10 stations), and Project I.D. #J-11473-18 (add four stations) | 8/14/2019 | Conditional Approval (PDF, 1.2MB) | Findings (PDF, 259 KB) |
Johnston | J-011721-19 | Johnston Endoscopy Center | 150206 | Cost overrun and change of scope for Project I.D. #J- 11033-15 (develop an ambulatory surgical facility with two gastrointestinal endoscopy rooms) involving a change in location and new ownership | 8/29/2019 | Conditional Approval (PDF, 15 MB) | Findings (PDF, 235 KB) |
Mecklenburg | F-011696-19 | Atrium Health Mercy | 923352 | Change of scope and cost overrun for Project I.D. #F- 11268-16 (renovate existing space related to surgical services and relocate one operating room from Carolinas Medical Center) which involves consolidating surgical services into one location as well as renovating acute care bed rooms and non-clinical areas | 8/8/2019 | Conditional Approval (PDF, 1.4 MB) | Findings (PDF, 321 KB) |
Mecklenburg | F-011722-19 | Atrium Health Kenilworth Diagnostic Center #2 | 190278 | Develop a new diagnostic center in MOB #2 by relocating existing GI, neurology, and urology equipment and adding a fluoroscopy unit, prostate biopsy unit, and two bladder scanners | 8/26/2019 | Conditional Approval (PDF, 1.4 MB) | Findings (PDF, 285 KB) |
Mecklenburg | F-011723-19 | Atrium Health Neurosciences Institute | 190284 | Relocate hospital-based specialty neurology providers to Atrium Health Kenilworth, a medical campus currently under development in Charlotte | 8/30/2019 | Conditional Approval (PDF, 1.3 MB) | Findings (PDF, 158 KB) |
Wake | J-011709-19 | Duke GI at Green Level | 190215 | Develop a new ambulatory surgical facility with four GI endoscopy rooms | 8/2/2019 | Conditional Approval (PDF, 1.3 MB) | Findings (PDF, 288 KB) |
Wake | J-011716-19 | Duke Imaging Services at Cary Parkway | 190273 | Develop a diagnostic center by adding mammography to an existing diagnostic testing facility | 8/30/2019 | Conditional Approval (PDF, 1.3 MB) | Findings (PDF, 148 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Craven | P-011701-19 | CarolinaEast Medical Center | Acquire a 3rd heart lung bypass machine to be used as backup for emergency coverage only | 7/25/2019 | Conditional Approval (PDF, 1.25 MB) | Findings (PDF, 246 KB) |
Duplin | P-011711-19 | Southeastern Dialysis Center - Kenansville | Relocate entire facility and relocate one station from Wallace Dialysis for a total of 20 stations upon completion of this project and Project# P-11680-19 (add two stations) | 7/25/2019 | Conditional Approval (PDF, 1.25 MB) | Findings (PDF, 243 KB) |
Durham | J-011698-19 | Liberty Assisted Living of Durham | Relocate no more than 29 ACH beds from Ellison's Rest Home and 20 ACH beds from Carver Living Center for a total of no more than 49 ACH beds upon project completion | 7/29/2019 | Conditional Approval (PDF, 1.48 MB) | Findings (PDF, 268 KB) |
Hyde | R-011699-19 | Cross Creek Health Care | Add no more than 30 ACH beds pursuant to a need determination in the 2019 SMFP for a total of no more than 50 NF beds and 30 ACH beds upon completion of this project and Project ID# F-11462-18 (relocate 20 NF beds to Charlotte) and Project ID# F-11461-18 (relocate 10 NF beds to Charlotte) | 7/12/2019 | Conditional Approval (PDF, 1.22 MB) | Findings (PDF, 195 KB) |
Iredell | F-011702-19 | Iredell Mooresville Campus | Develop a new diagnostic center | 7/19/2019 | Conditional Approval (PDF, 1.22 MB) | Findings (PDF, 295 KB) |
Iredell | F-011703-19 | Mooresville Inpatient Unit | Develop a new 10 bed hospice facility in southern Iredell County by relocating no more than 6 inpatient beds from Gordon Hospice House and adding no more than 4 residential beds | 7/19/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 205 KB) |
Mecklenburg | F-011700-19 | Atrium Health Kenilworth Diagnostic Center #1 | Develop a new diagnostic center in MOB #1 by relocating existing cardiology, vascular, pulmonology, and imaging equipment, including a CT scanner, and adding a diagnostic ultrasound machine, diagnostic x-ray equipment, two echocardiogram machines, and two pulmonary function test machines | 7/19/2019 | Conditional Approval (PDF, 1.31 MB) | Findings (PDF, 284 KB) |
Mecklenburg | F-011706-19 | Carolinas Gastroenterology Center - Kenilworth | Relocate the existing ambulatory surgical facility with two gastrointestinal endoscopy rooms and change the name to Carolinas Gastroenterology Center – Kenilworth | 7/19/2019 | Conditional Approval (PDF, 1.30 MB) | Findings (PDF, 221 KB) |
Mecklenburg | F-011691-19 | Novant Health Presbyterian Medical Center | Develop an endovascular lab with one interventional angiography system that will not perform cardiac catheterization procedures | 7/12/2019 | Conditional Approval (PDF, 1.17 MB) | Findings (PDF, 137 KB) |
Onslow | P-011710-19 | Richlands Dialysis | Develop a new 10-station dialysis facility by relocating eight stations from New River Dialysis and two stations from Southeastern Dialysis Center-Jacksonville | 7/25/2019 | Conditional Approval (PDF, 1.26 MB) | Findings (PDF, 186 KB) |
Robeson | N-011697-19 | Southeastern Regional Medical Center Gibson Cancer Center | Acquire a 2nd linear accelerator pursuant to an adjusted need determination in the 2019 SMFP | 7/26/2019 | Conditional Approval (PDF, 1.30 MB) | Findings (PDF, 248 KB) |
Wake | J-011705-19 | Wake Endoscopy Center-Cary | Develop a new ambulatory surgical facility with three Gastrointestinal endoscopy rooms | 7/19/2019 | Conditional Approval (PDF, 1.33 MB) | Findings (PDF, 172 KB) |
Wake | J-011690-19 | Duke Health Holly Springs | Change of scope for Project ID# J-11616-18 (develop a new diagnostic center) to add additional equipment | 7/17/2019 | Conditional Approval (PDF, 1.15 MB) | Findings (PDF, 99 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Alamance | G-011677-19 | North Burlington Dialysis | Add no more than 2 dialysis stations for a total of no more than 20 stations upon completion of this project, Project ID #G-11603-18 (add 2 stations) and Project ID #G-11289-17 (relocate 6 stations) | 6/7/2019 | Denied (PDF, 9.63 MB) | Findings (PDF, 169 KB) |
Catawba | E-011667-19 | FMC of Catawba Valley | Add no more than three dialysis stations for a total of no more than 25 stations upon completion of this project, Project ID #E-11209-16 (relocate six stations to FKC Newton), Project ID #E-11390-17 (add 5 stations), Project ID #E-11480-18 (add one station), and Project ID #E-11649-19 (relocate three stations to FKC Newton) | 6/17/2019 | Conditional Approval (PDF, 1.07 MB) | Findings (PDF, 153 KB) |
Cumberland | M-011663-19 | FMC Dialysis Services South Ramsey | Add no more than three dialysis stations and relocate 3 stations from Dunn Kidney Center (Harnett) for a total of no more than 47 stations upon completion of this project, Project ID# M-11286-17 (relocate 5 stations) and Project ID# M-11502-18 (relocate 5 stations | 6/28/2019 | Conditional Approval (PDF, 1.16 MB) | Findings (PDF, 182 KB) |
Cumberland | M-011662-19 | FMC Services of West Fayetteville | Add no more than one dialysis station for a total of no more than 40 stations upon completion of this project and Project ID #M-11650-19 (relocate one station) | 6/14/2019 | Conditional Approval (PDF, 1.05 MB) | Findings (PDF, 158 KB) |
Duplin | P-011680-19 | Southeastern Dialysis Center - Kenansville | Add no more than 2 dialysis stations for a total of no more than 19 stations | 6/14/2019 | Conditional Approval (PDF, 1.02 MB) | Findings (PDF, 214 KB) |
Hoke | N-011687-19 | Dialysis Care of Hoke County | Add no more than 5 dialysis stations for a total of no more than 23 stations upon completion of this project and Project ID# N-11588-18 (relocate 6 stations) | 6/7/2019 | Conditional Approval (PDF, 9.80 MB) | Findings (PDF, 166 KB) |
McDowell | C-011685-19 | McDowell Dialysis Center | Add no more than 2 dialysis stations for a total of no more than 17 stations upon completion of this project and Project ID #C-11594-18 (add 2 stations) | 6/17/2019 | Conditional Approval (PDF, 1011 KB) | Findings (PDF, 156 KB) |
Mitchell | D-011693-19 | Mitchell House | Add no more than 20 ACH beds for a total of no more than 100 ACH beds pursuant to a need determination in the 2019 SMFP | 6/14/2019 | Conditional Approval (PDF, 941 KB) | Findings (PDF, 166 KB) |
Moore | H-011694-19 | Seven Lakes Assisted Living | Acquire and relocate no more than 20 ACH beds from Country Time Inn pursuant to Policy LTC-2 for a total of no more than 80 ACH beds upon project completion | 6/7/2019 | Conditional Approval (PDF, 10.26 MB) | Findings (PDF, 156 KB) |
Rowan | F-011653-19 | The Landings of Salisbury | Relocate 106 ACH beds from Kannon Creek Assisted Living, to the replacement facility, The Landings of Salisbury, for a total of no more than 106 ACH beds upon project completion | 6/7/2019 | Conditional Approval (PDF, 10.27 MB) | Findings (PDF, 133 KB) |
Wake | J-011661-19 | Southwest Wake County Dialysis | Add no more than two dialysis stations for a total of no more than 30 stations upon completion of this project and Project ID # J-11510-18 (relocate two stations to FKC Holly Springs) | 6/21/2019 | Conditional Approval (PDF, 1.09 MB) | Findings (PDF, 153 KB) |
Wake | J-011682-19 | Wake Forest Dialysis Center | Add no more than 3 dialysis stations for a total of no more than 21 stations upon completion of this project, Project ID #J-11131-16 (relocate 10 stations), Project ID #J-11152-16 (add 1 station), Project ID #J-11254-16 (add 2 stations), and Project ID #J-11597-18 (add 3 stations) | 6/21/2019 | Conditional Approval (PDF, 1.08 MB) | Findings (PDF, 185 KB) |
Wayne | P-011684-19 | Mt. Olive Dialysis | Add no more than 3 dialysis stations for a total of no more than 20 stations upon completion of this project and Project ID #P-11598-18 (add 2 stations) | 6/6/2019 | Conditional Approval (PDF, 1021 KB) | Findings (PDF, 157 KB) |
Wayne | P-011683-19 | Goldsboro Dialysis Center | Add no more than 2 dialysis stations for a total of no more than 25 stations upon completion of this project, Project ID #P-11454-18 (relocate 7 stations), and Project ID #P-11596-18 (add six stations) | 6/3/2019 | Conditional Approval (PDF, 1014 KB) | Findings (PDF, 155 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Anson | H-011670-19 | FMC of Anson County | Add one dialysis station for a total of no more than 18 stations upon project completion | 5/10/2019 | Conditional Approval (PDF, 1.18 MB) | Findings (PDF, 143 KB) |
Brunswick | O-011679-19 | Southeastern Dialysis Center-Shallotte | Add no more than one dialysis station for a total of no more than 15 stations upon completion of this project and Project ID # O-11487-18 (add four stations) | 5/17/2019 | Conditional Approval (PDF, 1.07 MB) | Findings (PDF, 169 KB) |
Brunswick | O-011678-19 | Leland Dialysis | Add one dialysis station for a total of no more than 12 stations upon completion of this project and Project ID #O-11593-18 (add one station) | 5/10/2019 | Conditional Approval (PDF, 1.06 MB) | Findings (PDF, 155 KB) |
Carteret | P-011665-19 | Crystal Coast Dialysis Unit | Add no more than five dialysis stations for a total of no more than 21 stations upon completion of this project and Project ID #P-11538-18 (relocate entire facility) | 5/31/2019 | Conditional Approval (PDF, 1.18 MB) | Findings (PDF, 185 KB) |
Davidson | G-011674-19 | Lexington Dialysis Center | Add no more than 1 dialysis station and relocate no more than 4 dialysis stations from Piedmont Dialysis Center for a total of no more than 46 stations upon completion of this project, Project ID #G-11355-17 (replace the existing 37-station facility) and Project ID #G-11639-18 (add 4 stations) | 5/21/2019 | Conditional Approval (PDF, 1.11 MB) | Findings (PDF, 200 KB) |
Forsyth | G-011676-19 | Salem Kidney Center | Add no more than one dialysis station and relocate no more than three dialysis stations from Northside Dialysis Center for a total of no more than 51 stations upon completion of this project and Project ID #G-11586-18 (add 2 stations) | 5/29/2019 | Conditional Approval (PDF, 1.15 MB) | Findings (PDF, 182 KB) |
Forsyth | G-011675-19 | Miller Street Dialysis Center of Wake Forest University | Add no more than 4 dialysis stations for a total of no more than 48 stations upon project completion | 5/20/2019 | Conditional Approval (PDF, 1.10 MB) | Findings (PDF, 154 KB) |
Franklin | K-011669-19 | Fresenius Kidney Care Tar River | Add no more than two dialysis stations for a total of no more than 14 stations upon project completion | 5/3/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 201 KB) |
Gaston | F-011671-19 | Fresenius Medical Care Belmont | Add no more than three dialysis stations for a total of no more than 19 stations upon completion of this project and Project ID #F-11635-18 (relocate 3 stations) | 5/20/2019 | Conditional Approval (PDF, 1003 KB) | Findings (PDF, 151 KB) |
Guilford | G-011672-19 | High Point Kidney Center | Add no more than 2 dialysis stations and relocate 5 stations from Triad Dialysis Center for a total of no more than 48 stations upon completion of this project, Project ID #G-11587-18 (add 7 stations), Project ID #G-11639-18 (relocate 4 stations) and Project ID #G-11651-19 (relocate 3 stations) | 5/21/2019 | Conditional Approval (PDF, 1.07 MB) | Findings (PDF, 210 KB) |
Haywood | A-011686-19 | Waynesville Dialysis Center | Add no more than two dialysis stations for a total of no more than 21 stations upon project completion | 5/20/2019 | Conditional Approval (PDF, 1002 KB) | Findings (PDF, 158 KB) |
Iredell | F-011673-19 | Lake Norman Dialysis Center | Add 4 dialysis stations for a total of 31 stations | 5/16/2019 | Conditional Approval (PDF, 1.03 MB) | Findings (PDF, 244 KB) |
Mecklenburg | F-011668-19 | BMA OF NORTH CHARLOTTE | Add one dialysis station for a total of no more than 40 stations upon completion of this project, Project ID#F-11475-18 (add 1 station), Project ID # F-11400-17 (add 10 stations), Project ID # F-11375-17 (relocate 12 stations) | 5/24/2019 | Conditional Approval (PDF, 1.04 MB) | Findings (PDF, 255 KB) |
Mecklenburg | F-011666-19 | FMC Charlotte | Add no more than three dialysis stations for a total of no more than 45 stations upon completion of this project and Project ID# F-11633-18 (relocate three stations) | 5/22/2019 | Conditional Approval (PDF, 1.03 MB) | Findings (PDF, 279 KB) |
Mecklenburg | F-011658-19 | Atrium Health Mountain Island Emergency Department | Develop a satellite emergency department with diagnostic and treatment services essential to providing emergency care, including a CT scanner, ultrasound, x-ray, laboratory services and pharmacy services, to be operated as part of Atrium Health University | 5/16/2019 | Conditional Approval (PDF, 832 KB) | Findings (PDF, 286 KB) |
Onslow | P-011681-19 | Southeastern Dialysis Center of Jacksonville | Add no more than 5 stations for a total of no more than 38 stations upon completion od this project and Project ID #P-11415-17 (add two stations) | 5/3/2019 | Conditional Approval (PDF, 1.08 MB) | Findings (PDF, 155 KB) |
Pender | O-011689-19 | Southeastern Dialysis Center - Burgaw | Add one dialysis station for a total of no more than 19 stations upon project completion | 5/17/2019 | Conditional Approval (PDF, 1005 KB) | Findings (PDF, 230 KB) |
Transylvania | B-011688-19 | Brevard Dialysis | Add no more than 2 dialysis stations for a total of no more than 13 stations upon project completion | 5/21/2019 | Conditional Approval (PDF, 1.08 MB) | Findings (PDF, 144 KB) |
Union | F-011664-19 | METROLINA KIDNEY CENTER | Add no more than seven dialysis stations for a total of no more than 29 stations upon project completion | 5/22/2019 | Conditional Approval (PDF, 999 KB) | Findings (PDF, 166 KB) |
Wake | J-011659-19 | Rex Hospital | Acquire a second fixed dedicated PET scanner pursuant to the need determination in the 2019 SMFP | 5/1/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 150 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Caldwell | E-011630-18 | InSight Health Corp. | Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP | 4/29/2019 | Conditional Approval (PDF, 1.20 MB) | Findings (PDF, 702 KB) |
Catawba | E-011648-19 | FMC Hickory Home Program | Relocate existing hemodialysis training and support program and its two dialysis stations from FMC Hickory to FMC Hickory Home Program | 4/29/2019 | Conditional Approval (PDF, 1.02 MB) | Findings (PDF, 259 KB) |
Chatham | J-011656-19 | Chatham County Rehabilitation Center | Relocate 16 ACH beds from Liberty Commons (Halifax) and 20 ACH beds from Liberty Commons Nursing and Rehab Center (Columbus) to Chatham County Rehabilitation Center for a total of no more than 105 NF beds and 36 ACH beds upon project completion which is a change of scope for Project ID#s J-10168-13 (develop 90 NF beds) and J-11378-17 (COR/Change of scope - relocate only 15 NF beds based on Project ID J-11461-18, not 25) | 4/26/2019 | Conditional Approval (PDF, 1.45 MB) | Findings (PDF, 141 KB) |
Davidson | G-011639-18 | Lexington Dialysis Center | Relocate 4 dialysis stations from High Point Kidney Center (Guilford) upon completion of Project ID #G-11355-17 (Replace the existing facility) | 4/23/2019 | Conditional Approval (PDF, 1.11 MB) | Findings (PDF, 425 KB) |
Durham | J-011631-18 | Duke North Pavilion | Develop no more than 4 additional ORs pursuant to the need determination in the 2018 SMFP for a total of no more than 69 Ors upon project completion | 4/19/2019 | Conditional Approval (PDF, 1.35 MB) | Findings (PDF, 1.03 MB) |
Durham | J-011626-18 | Southpoint Surgery Center | Develop a new ASC with 2 procedure rooms and 4 ORs pursuant to the need determination in the 2018 SMFP | 4/9/2019 | Denied (PDF, 590 KB) | Findings (PDF, 1.03 MB) |
Forsyth | G-011640-18 | Novant Health Forsyth Medical Center | Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP | 4/29/2019 | Denied (PDF, 654 KB) | Findings (PDF, 702 KB) |
Guilford | G-011655-19 | LeBauer Endoscopy Center | Relocate no more than one GI endo room from Wesley Long Hospital for a total of no more than five GI endo rooms upon project completion | 4/30/2019 | Conditional Approval (PDF, 1.36 MB) | Findings (PDF, 171 KB) |
Guilford | G-011647-18 | Perspective PET Imaging, LLC | Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP | 4/29/2019 | Denied (PDF, 655 KB) | Findings (PDF, 702 KB) |
Iredell | F-011627-18 | Mobile Imaging Partners of North Carolina, LLC | Acquire a mobile PET/CT scanner pursuant to the need determination in the 2018 SMFP | 4/29/2019 | Denied (PDF, 657 KB) | Findings (PDF, 702 KB) |
Orange | J-011644-18 | University of North Carolina Hospitals | Develop 2 additional ORs pursuant to the need determination in the 2018 SMFP for a total of 42 ORs on the Chapel Hill Campus | 4/29/2019 | Conditional Approval (PDF, 1.20 MB) | Findings (PDF, 1.00 MB) |
Orange | J-011646-18 | University of North Carolina Hospitals-Hillsborough | Develop 2 ORs on the Hillsborough Campus pursuant to the 2018 SMFP need determination for a total of 8 ORs on the Hillsborough Campus | 4/29/2019 | Conditional Approval (PDF, 1.23 MB) | Findings (PDF, 1.00 MB) |
Orange | J-011645-18 | North Chapel Hill Surgery Center | Develop a new ASC with 2 ORs pursuant to the need determination in the 2018 SFMP | 4/29/2019 | Conditional Approval (PDF, 1.42 MB) | Findings (PDF, 1.00 MB) |
Orange | J-011632-18 | Duke Health Orange Ambulatory Surgical Center | Develop a new ambulatory surgical center in Chapel Hill with two operating rooms and two procedure rooms pursuant to the need determination in the 2018 SMFP | 4/29/2019 | Conditional Approval (PDF, 1.46 MB) | Findings (PDF, 1.00 MB) |
Rowan | F-011628-18 | Rowan Endoscopy Center | Develop a new ASC with 2 GI endoscopy rooms | 4/2/2019 | Conditional Approval (PDF, 1.36 MB) | Findings (PDF, 144 KB) |
Stanly | F-011652-19 | Trinity Place | Cost overrun for Project F-11370-17 (Relocate 17 ACH beds) | 4/17/2019 | Conditional Approval (PDF, 1.25 MB) | Findings (PDF, 96 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Catawba | E-011649-19 | Fresenius Kidney Care Newton | Relocate three stations from FMC of Catawba Valley to FKC Newton for a total of 15 stations at FKC Newton | 3/27/2019 | Conditional Approval (PDF, 1.16 MB) | Findings (PDF, 364 KB) |
Cumberland | M-011650-19 | Fresenius Kidney Care Rockfish | Relocate one dialysis station from FMC Services of West Fayetteville to FKC Rockfish for a total of 21 stations at FKC Rockfish | 3/29/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 442 KB) |
Cumberland | M-011634-18 | FMC DIALYSIS SERVICES NORTH RAMSEY | Relocate 3 dialysis stations from Dunn Kidney Center in Harnett County for a total of 43 stations at FMC Dialysis Services North Ramsey | 3/20/2019 | Conditional Approval (PDF, 1.22 MB) | Findings (PDF, 432 KB) |
Davidson | G-011651-19 | Thomasville Dialysis Center | Relocate no more than 3 dialysis stations from High Point Kidney Center (Guilford County) for a total of no more than 35 stations upon project completion | 3/11/2019 | Conditional Approval (PDF, 1.48 MB) | Findings (PDF, 433 KB) |
Durham | J-011613-18 | Duke North Pavilion | Renovate and upfit space in North Pavilion to accommodate relocation of Duke Compounding Facility, Clinical Pharmacy, and Hematologic Malignancies clinical services. In addition, renovate space for Adult Bone Marrow Transplant (ABMT) services | 3/18/2019 | Conditional Approval (PDF, 1.32 MB) | Findings (PDF, 402 KB) |
Gaston | F-011635-18 | BMA Kings Mountain | Relocate 3 dialysis stations from FMC Belmont to BMA Kings Mountain for a total of 21 stations upon project completion | 3/4/2019 | Conditional Approval (PDF, 1.13 MB) | Findings (PDF, 387 KB) |
Mecklenburg | F-011607-18 | Liberty Commons Nursing & Rehabilitation Center of Mint Hill | Relocate 12 ACH beds from Radbourne Manor Village (Project I.D. #F-11052-15) to Liberty Commons Nursing & Rehabilitation Center of Mint Hill (Project I.D. #F-11461-18) for a total of 83 NF beds and 12 ACH beds upon project completion | 3/29/2019 | Conditional Approval (PDF, 1.30 MB) | Findings (PDF, 347 KB) |
Mecklenburg | F-011619-18 | Carolina Center for Specialty Surgery | Develop one additional OR pursuant to the 2018 SMFP need determination for a total of no more than 3 ORs upon project completion | 3/29/2019 | Conditional Approval (PDF, 1.29 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011612-18 | Metrolina Vascular Access Care, LLC | Develop a new ambulatory surgical facility in Charlotte with one operating room and one procedure room focused on vascular access procedures for patients with end stage renal disease | 3/29/2019 | Conditional Approval (PDF, 1.51 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011625-18 | Novant Health Ballantyne Medical Center | Develop a new, separately licensed 36-bed acute care hospital by relocating 36 acute care beds from Novant Health Presbyterian Medical Center, two ORs and one GI Endo room from Novant Health Ballantyne Outpatient Surgery and develop one new dedicated C-Section OR and one new CT scanner | 3/29/2019 | Conditional Approval (PDF, 1.28 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011622-18 | Atrium Health Pineville | Add 38 additional acute care beds pursuant to the 2018 SMFP need determination for a total of 259 acute care beds upon completion of this project and Project I.D. # F-11361-17 (add 15 beds) | 3/29/2019 | Conditional Approval (PDF, 1.34 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011621-18 | Atrium Health Pineville | Develop one additional OR pursuant to the 2018 SMFP need determination for a total of no more than 13 ORs upon project completion | 3/29/2019 | Conditional Approval (PDF, 1.25 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011620-18 | Carolinas Medical Center | Develop no more than two additional ORs pursuant to the 2018 SMFP need determination for a total of no more than 62 ORs upon completion of this project and Project I.D. #F-11106-15 (relocate 2 ORs) | 3/29/2019 | Conditional Approval (PDF, 1.27 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011624-18 | Novant Health Huntersville Medical Center | Add 12 acute care beds and one OR pursuant to the 2018 SMFP need determination for a total of 151 acute care beds and 7 ORs upon completion of this project and Project I.D. #F-11110-15 (relocate 48 acute care beds and one OR from Novant Health Presbyterian Medical Center) | 3/29/2019 | Conditional Approval (PDF, 1.30 MB) | Findings (PDF, 1.82 MB) |
Mecklenburg | F-011633-18 | FRESENIUS KIDNEY CARE REGAL OAKS | Relocate 3 dialysis stations from FMC Charlotte to FMC Regal Oaks for a total of 15 stations upon completion | 3/29/2019 | Conditional Approval (PDF, 1.11 MB) | Findings (PDF, 364 KB) |
Nash | L-011611-18 | The Landings of Rocky Mount | Relocate 60 adult care home beds (including 30 special care unit beds) from The Gardens of Nashville (f/k/a Universal Health Care/Nashville) to a new 60-bed adult care home facility in Rocky Mount | 3/26/2019 | Conditional Approval (PDF, 1.32 MB) | Findings (PDF, 343 KB) |
Wake | J-011614-18 | Personal Home Care of North Carolina | Develop a new Medicare-certified home health agency in Wake County pursuant to the Need Determination in the 2018 State Medical Facilities Plan | 3/22/2019 | Conditional Approval (PDF, 1.24 MB) | Findings (PDF, 428 KB) |
Wake | J-011608-18 | The Rosewood Health Center | Add 21 NF beds under Policy NH-2, for a total of 57 NF beds upon project completion | 3/20/2019 | Conditional Approval (PDF, 1.42 MB) | Findings (PDF, 437 KB) |
Wilkes | D-011609-18 | The Gardens of Wilkesboro | Relocate entire 99 ACH bed facility, Wilkes County Adult Care, and change the name to The Gardens of Wilkesboro | 3/8/2019 | Conditional Approval (PDF, 9.43 MB) | Findings (PDF, 400 KB) |
Wilson | L-011623-18 | Wilson Pines Nursing and Rehabilitation Center | Add 13 NF beds by relocating 5 beds from Richmond Pines Nursing & Rehabilitation Center (Richmond), 5 beds from Westwood Hills Nursing & Rehabilitation Center (Wilkes), and 3 beds from Enfield Oaks Nursing & Rehabilitation Center (Halifax) for a total of 17 ACH beds and 108 NF beds upon project completion pursuant to Policy NH-6 | 3/21/2019 | Conditional Approval (PDF, 1.30 MB) | Findings (PDF, 436 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Henderson | B-011610-18 | The Landings of Hendersonville | Acquire and relocate 15 ACH beds from Country Meadow Rest Home and 43 ACH beds from The Gardens of the Blue Ridge, pursuant to Policy LTC-2 in the 2018 SMFP, to create a new facility for a total of 58 ACH beds upon project completion | 2/26/2019 | Conditional Approval (PDF, 1.36 MB) | Findings (PDF, 361 KB) |
Henderson | B-011641-18 | Hendersonville Dialysis Center | Cost overrun for Project ID #B-11246-16 (add 7 stations) | 2/20/2019 | Conditional Approval (PDF, 1.03 MB) | Findings (PDF, 340 KB) |
Mecklenburg | F-011566-18 | Carolinas Rehabilitation | Develop 8 new inpatient rehabilitation beds pursuant to the 2018 SMFP need determination for a total of 78 beds upon project completion | 2/27/2019 | Denied (PDF, 594 KB) | Findings (PDF, 636 KB) |
Mecklenburg | F-011584-18 | Novant Health Presbyterian Medical Center | Develop a 10-bed inpatient rehabilitation unit by developing the 8 beds in the 2018 SMFP need determination and relocating 2 existing rehab beds from Novant Health Rowan Medical Center | 2/27/2019 | Conditional Approval (PDF, 1.22 MB) | Findings (PDF, 636 KB) |
Pitt | Q-011636-18 | FMC Farmville | Relocate 4 dialysis stations from Greenville Dialysis Center for a total of 14 stations upon completion | 2/20/2019 | Conditional Approval (PDF, 1.20 MB) | Findings (PDF, 344 KB) |
Richmond | H-011629-18 | FirstHealth Moore Regional Hospital - Richmond | Relocate existing MRI scanner from Hamlet to Richmond | 2/1/2019 | Conditional Approval (PDF, 1.28 MB) | Findings (PDF, 353 KB) |
Union | F-011618-18 | Atrium Health Union West | Develop a new satellite campus of CHS Union by relocating 40 acute care beds, two ORs, one dedicated C-Section OR, one GI endoscopy room, and one CT scanner from CHS Union | 2/12/2019 | Conditional Approval (PDF, 1.33 MB) | Findings (PDF, 978 KB) |
Wake | J-011572-18 | FMC New Hope Dialysis | Add 8 dialysis stations for a total of 36 stations upon completion of this project, Project I.D. # J-11271-16 (relocate 6 stations to FMC Rock Quarry), Project I.D.# J-11312-17 (add 6 stations), Project I.D. # J-11372-17 (relocate 4 stations to FKC Selma) and Project I.D. # J-11510-18 (relocate 4 stations to FKC Holly Springs) | 2/27/2019 | Conditional Approval (PDF, 1.18 MB) | Findings (PDF, 529 KB) |
Wake | J-011575-18 | BMA of Raleigh | Add no more than four stations for a total of no more than 50 stations upon completion of this project and Project I.D. # J-11510-18 (relocate 4 stations to FKC Holly Springs) | 2/12/2019 | Conditional Approval (PDF, 1.05 MB) | Findings (PDF, 321 KB) |
Wayne | P-011581-18 | RAI Care Centers - Goldsboro | Add no more than three dialysis stations for a total of no more than 21 stations upon completion of this project, Project I.D. # P-11346-17 (relocate entire facility to a new location), and Project I.D. # P-11477-18 (add 2 stations) | 2/15/2019 | Conditional Approval (PDF, 1.25 MB) | Findings (PDF, 354 KB) |
Wayne | P-011596-18 | Goldsboro Dialysis Center | Add no more than 6 stations for a total of no more than 23 stations upon completion of this project and Project I.D. # P-11451-18 (relocate 7 stations to Rosewood Dialysis) | 2/15/2019 | Conditional Approval (PDF, 1.11 MB) | Findings (PDF, 347 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Brunswick | O-011593-18 | Leland Dialysis | Add 1 station for a total of 11 stations | 1/14/2019 | Conditional Approval (PDF, 1.06 MB) | Findings (PDF, 410 KB) |
Caldwell | E-011569-18 | BMA Lenoir | Add one station for a total of 42 stations upon completion of this project and the following projects: Project ID # E-11528-18 (change of scope); Project ID # E-11401-17 (add seven stations); and Project ID # E-11377-17 (relocate BMA Lenoir) | 1/10/2019 | Conditional Approval (PDF, 1.25 MB) | Findings (PDF, 429 KB) |
Catawba | E-011570-18 | Fresenius Medical Care of Hickory | Add two stations for a total 35 stations upon completion of this project, Project I.D. # E-11485-18 (add 4 stations) and Project I.D. # E-11209-16 (relocate 6 stations to FKC Newton) | 1/17/2019 | Conditional Approval (PDF, 1.08 MB) | Findings (PDF, 431 KB) |
Edgecombe | L-011580-18 | BMA EAST ROCKY MOUNT | Add 2 stations for a total of 26 stations upon completion of this project, Project ID # L-11374-17 (relocate 10 stations to FMC Boice-Willis) and Project ID # L-11483-18 (add 4 stations) | 1/9/2019 | Conditional Approval (PDF, 1.24 MB) | Findings (PDF, 408 KB) |
Guilford | G-011587-18 | High Point Kidney Center | Add 7 dialysis stations for a total of 48 stations | 1/7/2019 | Conditional Approval (PDF, 1.20 MB) | Findings (PDF, 416 KB) |
Lee | J-011578-18 | Carolina Dialysis - Sanford | Relocate entire facility and add 6 stations for a total of 39 | 1/11/2019 | Conditional Approval (PDF, 1.21 MB) | Findings (PDF, 375 KB) |
Mecklenburg | F-011637-18 | INS Charlotte | Relocate 2 dialysis stations from BMA Beatties Ford | 1/14/2019 | Conditional Approval (PDF, 660 KB) | Findings (PDF, 450 KB) |
Mecklenburg | F-011638-18 | INS-HUNTERSVILLE | Relocate 2 dialysis stations from BMA Beatties Ford | 1/14/2019 | Conditional Approval (PDF, 1.06 MB) | Findings (PDF, 442 KB) |
Mecklenburg | F-011590-18 | Mountain Island Lake Dialysis | Develop a new 10-station dialysis facility by relocating 10 stations from North Charlotte Dialysis | 1/7/2019 | Conditional Approval (PDF, 1.45 MB) | Findings (PDF, 498 KB) |
Moore | H-011643-18 | Pinehurst Home Training | Develop a new kidney disease treatment center to provide home peritoneal dialysis training and support services by relocating the existing PD program from Dialysis Care of Moore County | 1/25/2019 | Conditional Approval (PDF, 1.13 MB) | Findings (PDF, 380 KB) |
New Hanover | O-011642-18 | Wrightsville Beach Dialysis | Develop a new 10-station facility by relocating 8 stations from Cape Fear Dialysis and 2 stations from Southeastern Dialysis Center - Wilmington | 1/7/2019 | Conditional Approval (PDF, 1.27 MB) | Findings (PDF, 452 KB) |
Wake | J-011615-18 | Well Care Home Health | Develop a new Medicare-certified home health agency in Wake County pursuant to the 2018 SMFP need determination | 1/29/2019 | Conditional Approval (PDF, 1.22 MB) | Findings (PDF, 521 KB) |
Wake | J-011551-18 | RAC Surgery Center, LLC | Develop a new ASC with one OR and two procedure rooms for vascular access procedures for ESRD patients pursuant to a need determination in the 2018 SMFP | 1/28/2019 | Conditional Approval (PDF, 1.64 MB) | Findings (PDF, 1.90 MB) |
Wake | J-011553-18 | Rex Surgery Center of Garner | Develop a new ASC in Garner with two ORs pursuant to the need determination in 2018 SMFP | 1/28/2019 | Denied (PDF, 643 KB) | Findings (PDF, 1.90 MB) |
Wake | J-011554-18 | UNC Health Care Panther Creek Ambulatory Surgery Center | Develop a freestanding ASC by developing two ORs pursuant to the need determination in 2018 SMFP | 1/28/2019 | Denied (PDF, 653 KB) | Findings (PDF, 1.90 MB) |
Wake | J-011557-18 | Green Level Ambulatory Surgical Center | Develop a new ambulatory surgical center with four ORs pursuant to a need determination in the 2018 SMFP | 1/28/2019 | Denied (PDF, 642 KB) | Findings (PDF, 1.90 MB) |
Wake | J-011555-18 | Rex Hospital | Add two ORs pursuant to the need determination in the 2018 SMFP | 1/28/2019 | Denied (PDF, 638 KB) | Findings (PDF, 1.90 MB) |
Wake | J-011561-18 | Ortho NC ASC | Develop a new ASC with one OR and one procedure room pursuant to a need determination in the 2018 SMFP | 1/28/2019 | Conditional Approval (PDF, 1.56 MB) | Findings (PDF, 1.90 MB) |
Wake | J-011565-18 | WakeMed Surgery Center-Cary | Develop a new ASC with 2 ORs in Cary pursuant to the need determination in the 2018 SMFP | 1/28/2019 | Denied (PDF, 640 KB) | Findings (PDF, 1.90 MB) |
Wake | J-011564-18 | WakeMed Surgery Center-North Raleigh | Develop a new ASC with two ORs and two procedure rooms pursuant to a need determination in the 2018 SMFP | 1/28/2019 | Denied (PDF, 636 KB) | Findings (PDF, 1.90 MB) |
Wake | J-011616-18 | Duke Health Holly Springs | Develop a new diagnostic center | 1/14/2019 | Conditional Approval (PDF, 1.07 MB) | Findings (PDF, 500 KB) |
Wake | J-011617-18 | Duke Health Center Apex | Develop a new diagnostic center | 1/14/2019 | Conditional Approval (PDF, 1.19 MB) | Findings (PDF, 459 KB) |
Wake | J-011597-18 | Wake Forest Dialysis Center | Add 3 stations for a total of 18 stations upon completion of this project, Project I.D. #J-11131-16 (relocate 10 stations to Oak City Dialysis), Project I.D. #J-11152-16 (add 1 station), and Project I.D. #J-11254-16 (add 2 stations) | 1/7/2019 | Conditional Approval (PDF, 1.17 MB) | Findings (PDF, 412 KB) |
Washington | R-011576-18 | FMC Dialysis Services of Plymouth | Add two stations for a total of 16 stations | 1/18/2019 | Conditional Approval (PDF, 1.10 MB) | Findings (PDF, 407 KB) |
Wayne | P-011598-18 | Mt. Olive Dialysis | Add 2 stations for a total of 17 stations | 1/3/2019 | Conditional Approval (PDF, 1.18 MB) | Findings (PDF, 418 KB) |