Each month, the Certificate of Need Section makes decisions regarding applications under review to either conditionally approve the application or to disapprove it. The Certificate of Need Section also prepares "findings" which explain the basis for the decision.
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Cabarrus | F-011105-15 | Levine Cancer Institute-Concord | Expand and renovate the Levine Cancer Institute outpatient infusion clinic and develop a Phase I clinical trials unit | 12/4/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 344 KB) |
Caldwell | E-011054-15 | Caldwell Surgery Center | Develop a new ambulatory surgical facility (ASF) by relocating the 3 existing operating rooms (ORs) at the Hancock Surgery Center in Lenoir to Granite Falls where the new ASF would have 3 ORs and 1 procedure room | 12/28/2015 | Conditional Approval (PDF, 181 KB) | Findings (PDF, 357 KB) |
Davidson | G-011074-15 | Lexington Dialysis Center | Relocate 4 dialysis stations from Piedmont Dialysis Center for a total of 37 dialysis stations upon completion of this project and Project ID #G-11004-15 (add 3 stations) | 12/14/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 395 KB) |
Durham | J-011084-15 | Durham Dialysis | Add 3 dialysis stations for a total of 25 stations upon completion of this project and Project ID #J-10319-14 (relocate 7 stations) | 12/4/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 399 KB) |
Guilford | G-011075-15 | High Point Kidney Center | Add 8 dialysis stations for a total of 40 dialysis stations upon completion of this project and Project ID #G-10262-14 (relocate 10 stations from High Point Kidney Center) | 12/14/2015 | Conditional Approval (PDF, 177 KB) | Findings (PDF, 383 KB) |
Mecklenburg | F-011076-15 | North Charlotte Dialysis Center | Add ten dialysis stations for a total of 37 stations upon completion of this project and Project ID #F-10219-13 (relocate 10 stations) and Project ID #F-11019-15 (relocate 4 stations) | 12/29/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 350 KB) |
Mecklenburg | F-011052-15 | Radbourne Manor Village | Replace and relocate 12 existing ACH beds from Radbourne Manor III to a new location where the facility will be called Radbourne Manor Village | 12/28/2015 | Denied (PDF, 149 KB) | Findings (PDF, 274 KB) |
New Hanover | O-011082-15 | Southeastern Dialysis Center-Wilmington | Add 2 dialysis stations for a total of 34 stations upon completion of this project and Project ID #O-10324-14 (relocate 10 stations), Project ID #O-10346-14 (add 10 stations), and Project ID #O-11018-15 (add 3 stations) | 12/18/2015 | Conditional Approval (PDF, 177 KB) | Findings (PDF, 377 KB) |
New Hanover | O-011060-15 | Porters Neck Imaging | Acquire a fixed MRI scanner for a total of 1 mobile MRI scanner and 1 fixed MRI scanner | 12/4/2015 | Denied (PDF, 148 KB) | Findings (PDF, 640 KB) |
New Hanover | O-011063-15 | Wilmington Health | Acquire one fixed MRI scanner | 12/4/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 640 KB) |
New Hanover | O-011070-15 | Carolina Bay of Wilmington at Autumn Hall | Change of scope for Project ID #O-10088-13 (Develop 30 Policy NH-2 beds) by developing 12 Policy NH-2 beds and developing 18 Policy LTC-1 beds | 12/4/2015 | Conditional Approval (PDF, 180 KB) | Findings (PDF, 251 KB) |
Pender | O-011086-15 | Southeastern Dialysis Center, Inc. - Burgaw | Relocate 3 dialysis stations from Wallace Dialysis Center for a total of 18 stations upon completion of this project and Project ID #O-10348-14 (add 3 stations) and Project ID #O-10125-13 (transfer 10 stations) | 12/18/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 362 KB) |
Stanly | F-011071-15 | Carolina Farms Group Home #1 | Transfer 1 bed from J Iverson Riddle Development Center to the Carolina Farms Group Home #1 | 12/21/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 303 KB) |
Stanly | F-011072-15 | Carolina Farms Group Home #2 | Transfer 1 bed from J Iverson Riddle Development Center to the Carolina Farms Group Home #2 | 12/21/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 303 KB) |
Stanly | F-011073-15 | Carolina Farms Group Home #3 | Transfer 1 bed from J. Iverson Riddle Development Center to Carolina Farms Group Home #3 | 12/21/2015 | Conditional Approval (PDF, 178 KB) | Findings (PDF, 303 KB) |
Wake | J-011090-15 | Wake Forest Dialysis Center | Add 2 dialysis stations for a total of 22 stations upon project completion | 12/18/2015 | Conditional Approval (PDF, 176 KB) | Findings (PDF, 310 KB) |
Wake | J-011095-15 | Fresenius Medical Care Eastern Wake | Add three dialysis stations for a total of 17 stations upon completion of this project and Project ID #K-10099-13 (relocate 7 stations to FMC Tar River) and Project ID #J-10343-14 (add three stations) | 12/18/2015 | Conditional Approval (PDF, 177 KB) | Findings (PDF, 253 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Alamance | G-011100-15 | Carolina Dialysis - Mebane | Add eight dialysis stations for a total of 20 dialysis stations upon project completion | 11/5/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 432 KB) |
Burke | E-011094-15 | BMA OF BURKE COUNTY | Add two dialysis stations for a total of 33 stations upon completion of this project and Project ID #E-11009-15 (relocate facility and add six dialysis stations) | 11/24/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 368 KB) |
Cabarrus | F-011088-15 | Harrisburg Dialysis Center | Add six dialysis stations for a total of 25 dialysis stations upon project completion | 11/20/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 367 KB) |
Chatham | J-011064-15 | Coventry House of Siler City | Add 20 ACH beds by relocating 20 existing ACH beds from Careview Rest Home for a total of 86 ACH beds upon completion | 11/20/2015 | Conditional Approval (PDF, 197 KB) | Findings (PDF, 315 KB) |
Gaston | F-011096-15 | BMA Kings Mountain | Add two dialysis stations for a total of 16 dialysis stations upon completion of this project | 11/20/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 364 KB) |
Harnett | M-011062-15 | Central Harnett Hospital | Acquire one linear accelerator and one CT simulator to develop a comprehensive cancer center | 11/13/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 364 KB) |
Henderson | B-011047-15 | Winchester House | Relocate beds from Nana's Assisted Living in Buncombe County to the previously approved Winchester House in Henderson County | 11/24/2015 | Conditional Approval (PDF, 155 KB) | Findings (PDF, 250 KB) |
Mecklenburg | F-011091-15 | Carolinas Medical Center Mercy/Pineville | Cost overrun for Project ID #F-10215-13 (develop 34 additional acute care beds on the Mercy Campus) | 11/20/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 179 KB) |
Wake | J-011057-15 | Duke Cancer Center Macon Pond | Renovate patient care space, including radiology services, at the Duke Cancer Center Macon Pond | 11/13/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 323 KB) |
Wake | J-011097-15 | BMA Wake Dialysis Clinic, Inc | Add three dialysis stations for a total of 50 stations upon completion of this project and Project ID #J-10152-13 (relocate 10 stations to FMC Northern Wake), Project ID #J-10183-13 (add 10 stations to BMA Wake), and Project ID #J-11068-15 (relocate 3 stations to FMC Northern Wake) | 11/20/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 313 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Durham | J-011059-15 | Duke Sports Science Institute | Develop a diagnostic center by acquiring two digital radiography machines | 10/29/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 390 KB) |
Guilford | G-011053-15 | KC Greensboro Expansion | Relocate 22 ACH beds from Bell House to a new 22-bed ACH facility on Abbotswood at Irving Park campus | 10/29/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 281 KB) |
Johnston | J-011046-15 | Johnston Manor | Construct a new 132-bed adult care home facility by relocating and replacing Cardinal Care and Smithfield House West | 10/16/2015 | Conditional Approval (PDF, 155 KB) | Findings (PDF, 340 KB) |
Wake | J-011049-15 | Triangle Springs | Develop 12 adult chemical dependency beds in conjunction with a newe 43-bed adult inpatient psychiatric facility proposed in Project ID #J-11036-15 | 10/12/2015 | Under Review (PDF, 153 KB) | Findings (PDF, 364 KB) |
Wake | J-011068-15 | FMC Northern Wake | Relocate three dialysis stations from Wake Dialysis Clinic to FMC Northern Wake for a total of 16 dialysis stations upon completion of project | 10/27/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 358 KB) |
Wayne | P-011050-15 | Wayne Memorial Hospital | Expand and renovate space at its main hospital campus related to the provision of surgical and endoscopy services which involves a change of scope for Project ID #P-7554-06 (add one OR) and developing two new hybrid ORs | 10/16/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 318 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Durham | J-011045-15 | Croasdaile Village | Add 34 adult care home beds for a total of 64 adult care home beds upon project completion | 9/4/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 300 KB) |
Forsyth | G-011051-15 | Novant Health Forsyth Medical Center | Replace and convert an existing PET/CT scanner to a mobile PET/CT scanner pursuant to Policy TE-1 in the 2015 SMFP | 9/2/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 404 KB) |
Guilford | G-011055-15 | Fresenius Medical Care High Point | Develop a new 10-station dialysis facility by relocating 10 dialysis stations from BMA South Greensboro | 9/4/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 416 KB) |
Mecklenburg | F-011038-15 | St Margaret's of Trevi Village | Develop a new CCRC with 160 independent living units, 52 adult care home beds, including a 20-bed special care unit | 9/8/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 262 KB) |
New Hanover | O-011042-15 | New Hanover Regional Medical Center | Develop the 31 acute care beds in the 2015 SMFP for a total of 678 acute care beds | 9/11/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 376 KB) |
Wake | J-011044-15 | Waltonwood Lake Boone | Relocate 40 ACH beds from James Rest Home to a newly constructed 40-bed facility, which will include a 19-bed special memory care unit | 9/28/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 345 KB) |
Wake | J-011048-15 | Pinnacle Health Services of North Carolina, LLC | Replace existing 2D digital mammography machine which will result in the development of a new diagnostic center | 9/4/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 317 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Buncombe | B-011037-15 | South Buncombe County Dialysis | Develop a new dialysis facility by relocating 10 stations from Swannanoa Dialysis | 8/28/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 316 KB) |
Burke | E-011040-15 | Burke Hospice and Palliative Care Ctr. | Develop 3 additional hospice inpatient beds by converting 3 residential beds for a total of 11 inpatient beds and 3 residential beds | 8/28/2015 | Conditional Approval (PDF, 124 KB) | Findings (PDF, 348 KB) |
Davidson | G-011043-15 | Grayson Creek of Welcome | Relocate 15 ACH beds from Hilltop Living Center (Davidson County) and 5 ACH beds from Heritage Center (Rowan County) to Grayson Creek of Welcome for a total of 75 ACH beds upon project completion | 8/12/2015 | Conditional Approval (PDF, 127 KB) | Findings (PDF, 325 KB) |
Edgecombe | L-011011-15 | FMC Tarboro | Develop a new 10-station dialysis facility in Tarboro (Edgecombe County) by relocating six stations from BMA East Rocky Mount (Edgecombe County) and four stations from Greenville Dialysis Center (Pit County) | 8/28/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 293 KB) |
Johnston | J-011033-15 | Johnston Health Endoscopy Services, LLC | Develop an ASC with two GI endoscopy rooms in Clayton by relocating one GI endoscopy room from Johnston Health Clayton and developing a new GI endoscopy room | 8/28/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 394 KB) |
Mecklenburg | F-011020-15 | Mint Hill Dialysis Center | Relocate 1 dialysis station from South Charlotte Dialysis for a total of no more than 12 stations upon project completion | 8/6/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 349 KB) |
Mecklenburg | F-011041-15 | BMA OF NORTH CHARLOTTE | Cost overrun for Project ID #F-10333-14 (add four dialysis stations) | 8/13/2015 | Conditional Approval (PDF, 127 KB) | Findings (PDF, 270 KB) |
Orange | J-011028-15 | University of North Carolina Hospitals | Cost overrun for Project ID #J-8812-12 (add 27 acute care beds) | 8/17/2015 | Conditional Approval (PDF, 125 KB) | Findings (PDF, 256 KB) |
Orange | J-011035-15 | University of North Carolina Hospitals-Hillsborough | Relocate one existing linear accelerator from the Chapel Hill campus to the Hillsborough campus | 8/28/2015 | Denied (PDF, 148 KB) | Findings (PDF, 248 KB) |
Pitt | Q-011027-15 | Vidant Medical Center | Add 85 acute care beds for a total of 1059 acute care beds upon completion of this project and Project ID #Q-10068-12 (add 65 acute care beds) | 8/31/2015 | Conditional Approval (PDF, 125 KB) | Findings (PDF, 415 KB) |
Rutherford | C-011016-15 | Dialysis Care of Rutherford County | Add no more than 3 dialysis stations by relocating 3 stations from Asheville Kidney Center (Buncombe County) for a total of no more than 33 stations upon project completion | 8/28/2015 | Denied (PDF, 149 KB) | Findings (PDF, 316 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Brunswick | O-011026-15 | Strategic Behavioral Center-Leland | Develop 20 adult psychiatric beds for a total of 20 adult inpatient psychiatric beds, 20 child/adolescent inpatient psychiatric beds and 54 PRTF beds upon project completion | 7/9/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 400 KB) |
Caldwell | E-011039-15 | Caldwell Hospice & Palliative Care | Develop 3 additional hospice inpatient beds by converting 3 residential beds for a total of 8 inpatient beds and 4 residential beds | 7/29/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 525 KB) |
Cherokee | A-011013-15 | Smoky Mountain Dialysis Center | Add no more than three dialysis stations for a total of 13 stations upon project completion | 7/31/2015 | Conditional Approval (PDF, 125 KB) | Findings (PDF, 287 KB) |
Forsyth | G-011024-15 | Old Vineyard Youth Services | Relocate 60 inpatient psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 for a total of 52 child/adolescent inpatient psychiatric beds and 104 adult inpatient psychiatric beds upon project completion | 7/14/2015 | Conditional Approval (PDF, 128 KB) | Findings (PDF, 413 KB) |
Mecklenburg | F-011003-15 | Strategic Behavioral Center-Charlotte | Relocate 24 inpatient psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 and convert 24 PRTF beds for a total of 24 child/adolescent inpatient psychiatric beds and 36 PRTF beds upon project completion | 7/9/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 376 KB) |
New Hanover | O-011018-15 | Southeastern Dialysis Center | Add no more than 3 dialysis stations for a total of no more than 32 stations upon completion of this project and Project ID #O-10324-14 (relocate 10 stations to New Hanover Dialysis Center) | 7/31/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 310 KB) |
New Hanover | O-011022-15 | Cape Fear Dialysis Center | Add no more than 2 dialysis stations for a total of no more than 32 stations upon completion of this project and Project ID #O-103244-14 (relocate 2 stations to New Hanover Dialysis Center) | 7/29/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 253 KB) |
Orange | J-011032-15 | University of North Carolina Hospitals | Add 42 acute care beds on the Chapel Hill campus for a total of 806 acute care beds upon completion of this project and Project ID #J-011034-15 (add 4 acute care beds on the Hillsborough campus) | 7/28/2015 | Conditional Approval (PDF, 150 KB) | Findings (PDF, 494 KB) |
Orange | J-011034-15 | University of North Carolina Hospitals-Hillsborough | Add 4 acute care beds on the Hillsborough campus for a total of 806 acute care beds upon completion of this project and Project ID #J-011032-15 (add 42 acute care beds on the Chapel Hill campus) | 7/24/2015 | Under Review (PDF, 127 KB) | Findings (PDF, 366 KB) |
Rowan | F-011023-15 | Dialysis Care of Rowan County | Add no more than 4 dialysis stations for a total of no more than 27 stations upon completion of this project, Project ID #F-10273-14 (relocate 1 station to Dialysis Care of Kannapolis) and Project ID #F-10371-15 (relocate 5 stations to Dialysis Care of Kannapolis) | 7/8/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 371 KB) |
Vance | K-011029-15 | Maria Parham Medical Center | Add 11 acute care beds for a total of 102 acute care beds upon project completion | 7/31/2015 | Conditional Approval (PDF, 127 KB) | Findings (PDF, 329 KB) |
Wake | J-011025-15 | BMA of Fuquay Varina Kidney Center | Cost overrun for Project ID #J-10339-14 (add four stations and home therapies) | 7/20/2015 | Conditional Approval (PDF, 127 KB) | Findings (PDF, 171 KB) |
Wake | J-011030-15 | Strategic Behavioral Center-Garner | Relocate 24 inpatient psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 in the 2015 SMFP for a total of 24 adult inpatient psychiatric beds, 32 child/adolescent inpatient psychiatric beds and 36 PRTF beds upon project completion | 7/15/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 349 KB) |
Wake | J-011031-15 | Duke GI at Brier Creek | Relocate the existing licensed facility and develop two additional GI endoscopy rooms for a total of 4 rooms upon project completion | 7/23/2015 | Conditional Approval (PDF, 127 KB) | Findings (PDF, 419 KB) |
Wake | J-011036-15 | Triangle Springs | Develop 43 adult inpatient psychiatric beds pursuant to the need determination in the 2015 SMFP | 7/27/2015 | Conditional Approval (PDF, 126 KB) | Findings (PDF, 371 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Alamance | G-011015-15 | North Burlington Dialysis Center | Add no more than two dialysis stations for a total of no more than 16 stations upon completion of this project, Project ID #G-10352-14 (add 3 stations) | 6/5/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 424 KB) |
Bladen | N-011021-15 | Southeastern Dialysis Center-Elizabethtown | Add no more than two dialysis stations for a total of no more than 26 stations upon project completion | 6/15/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 449 KB) |
Burke | E-011009-15 | BMA Burke County | Relocate existing facility and add six stations for a total of 31 stations upon project completion | 6/12/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 405 KB) |
Cabarrus | F-011019-15 | Copperfield Dialysis Center | Relocate the facility to a new location and add four stations relocated from North Charlotte Dialysis Center for a total of 31 stations upon completion of this project and Project I.D. #F-10109-13, (add 6 stations by relocation from Dialysis Care of Kannapolis in Rowan County) | 6/8/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 427 KB) |
Davidson | G-011004-15 | Lexington Dialysis Center | Add no more than 4 dialysis stations for a total of no more than 34 stations upon project completion | 6/5/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 401 KB) |
Duplin | P-011014-15 | Wallace Dialysis Center | Add no more than 2 dialysis stations for a total of no more than 16 stations upon completion of this project and Project ID #O-10348-14 (relocate 3 stations to Southeastern Dialysis Center-Burgaw) | 6/5/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 444 KB) |
Granville | K-011006-15 | FMS Dialysis Services of Oxford | Add no more than 4 dialysis stations for a total of no more than 23 stations upon project completion | 6/4/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 297 KB) |
Richmond | H-011017-15 | Dialysis Care of Richmond Co | Add no more than 2 dialysis stations for a total of no more than 28 stations upon completion of this project, Project ID #H-11001-15 (relocate 4 stations to Sandhills Dialysis Center) | 6/16/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 425 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Gaston | F-011008-15 | FRESENIUS MEDICAL CARE OF SOUTH GASTON | Add no more than six dialysis stations for a total of no more than 26 stations upon project completion | 5/5/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 302 KB) |
Gaston | F-011010-15 | Fresenius Medical Care Belmont | Add no more than 2 dialysis stations for a total of no more than 18 stations upon project completion | 5/5/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 309 KB) |
Guilford | G-011005-15 | BMA of Southwest Greensboro | Add no more than 2 dialysis stations for a total of no more than 33 stations upon project completion | 5/7/2015 | Conditional Approval (PDF, 150 KB) | Findings (PDF, 536 KB) |
Mecklenburg | F-011007-15 | BMA Beatties Ford | Add no more than 4 dialysis stations for a total of no more than 43 stations upon completion of this project and Project ID #F-10259-14 (add 7 stations) | 5/6/2015 | Under Review (PDF, 150 KB) | Findings (PDF, 504 KB) |
Mecklenburg | F-011012-15 | FMC MATTHEWS | Add no more than 8 dialysis stations for a total of no more than 21 stations upon completion of this project and Project ID #F-10369-15 (relocate 8 stations to FMC Regal Oaks) | 5/7/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 531 KB) |
Onslow | P-011002-15 | Brynn Marr Hospital | Relocate 18 inpatient psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 for a total of 12 adult inpatient psychiatric beds, 60 child/adolescent inpatient psychiatric beds and 12 substance abuse beds upon project completion | 5/28/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 351 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Cumberland | M-010367-14 | Cumberland County Rehabilitation Center | Relocate the 58 nursing facility beds from Golden Years Nursing Home and the 36 adult care home beds from Mann Street Residential Care Facility to develop a new combination nursing facility | 4/29/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 420 KB) |
Davie | G-010372-15 | Bermuda Village Retirement Center | Constuct addition and renovate existing facility in order to add 12 nursing facility beds | 4/10/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 437 KB) |
Martin | Q-010361-14 | Martin General Hospital | Offer inpatient dialysis services | 4/24/2015 | Conditional Approval (PDF, 149 KB) | Findings (PDF, 310 KB) |
Mecklenburg | F-010370-15 | East Mecklenburg Inpatient Unit at Aldersgate | Relocate 6 hospice inpatient beds approved in Project ID # F-10132-13 from Levine & Dickson Hospice House in Huntersville to the East Mecklenburg Inpatient Unit at Aldersgate in Charlotte | 4/24/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 482 KB) |
New Hanover | O-010366-14 | Liberty Commons Rehabilitation Center | Relocate 72 ACH beds within the same county to an existing combination nursing facility for a total of 100 nursing facility and 112 ACH beds upon project completion | 4/29/2015 | Denied (PDF, 146 KB) | Findings (PDF, 407 KB) |
Richmond | H-011001-15 | Sandhills Dialysis | Relocate four dialysis stations from Dialysis Care of Richmond County for a total of 16 at Sandhills Dialysis upon project completion | 4/6/2015 | Conditional Approval (PDF, 176 KB) | Findings (PDF, 401 KB) |
Rowan | F-010371-15 | Dialysis Care of Kannapolis | Relocate 5 certified dialysis stations from Dialysis Care of Rowan to Dialysis Care of Kannapolis for a total of 25 stations upon completion of this project, Project ID #F-10273-14 (add 1 station) and Project ID #F-10109-13 (relocate 6 stations to Copperfield Dialysis Center) | 4/7/2015 | Conditional Approval (PDF, 150 KB) | Findings (PDF, 428 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Forsyth | G-010359-14 | Brookstone Terrace | Relocate 13 ACH beds from The Crest of Clemmons to Brookstone Terrace and convert 5 existing ACH beds at Brookstone Terrace for a total of 18 beds in a newly constructed special care unit addition | 3/30/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 540 KB) |
Mecklenburg | F-010369-15 | FMC Regal Oaks | Develop a new 12-station dialysis facility by relocating eight stations from FMC Matthews and four stations from BMA East Charlotte | 3/27/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 457 KB) |
Wayne | P-010365-14 | Coastal Carolina Dialysis | Develop a new 12-station dialysis facility (relocate 10 stations from Goldsboro Dialysis Center and 2 stations from Goldsboro South Dialysis Center) and relocate the existing home training program | 3/4/2015 | Conditional Approval (PDF, 179 KB) | Findings (PDF, 602 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Alamance | G-010357-14 | Peak Resources-Alamance Inc | Relocate 120 nursing facility beds within Alamance County and construct a replacement facility | 2/23/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 390 KB) |
Cumberland | M-010340-14 | BMA Fayetteville | Add 3 dialysis stations for a total of 45 dialysis stations upon completion of this project, and Project ID# M10304-14 (relo of facility) and Project ID # M-10191-13 (add 3) | 2/25/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 318 KB) |
Franklin | K-010353-14 | Dialysis Care of Franklin County | Add four stations for a total of 27 | 2/25/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 455 KB) |
Hoke | N-010345-14 | Dialysis Care of Hoke County | Relocate one station from Dialysis Care of Richmond County for a total of 28 station upon project completion | 2/25/2015 | Denied (PDF, 146 KB) | Findings (PDF, 483 KB) |
Johnston | J-010364-14 | Clayton Radiation Oncology | Acquire a CT simulator for the existing radiation therapy service in Clayton | 2/23/2015 | Conditional Approval (PDF, 177 KB) | Findings (PDF, 390 KB) |
New Hanover | O-010346-14 | Southeastern Dialysis Center | Add ten dialysis stations for a total of 29 dialysis stations upon completion of this project and Project ID # O-10324-14 (relocate 10 stations) | 2/25/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 395 KB) |
Pender | O-010348-14 | Southeastern Dialysis Center, Inc. - Burgaw | Add 3 dialysis stations for a total of 15 dialysis stations upon completion of this projet and Project ID #O-10125-13 (relocate 10) | 2/25/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 281 KB) |
Wake | J-010362-14 | Duke Cancer Center Cary Radiation Oncology | Replace existing linear accelerator located at Duke Cancer Center Cary Radiation Oncology | 2/13/2015 | Conditional Approval (PDF, 153 KB) | Findings (PDF, 428 KB) |
Wake | J-010363-14 | Duke Cancer Center Macon Pond | Replace existing linear accelerator located at Duke Cancer Center Macon Pond | 2/13/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 420 KB) |
Wilkes | D-010326-14 | Wilkes Regional Dialysis Center | Add three dialysis stations to the existing facility for a total 24 dialysis stations upon completion | 2/23/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 378 KB) |
County | Project I.D. # | Facility | Type of Project | Date of Decision | Decision | Findings |
---|---|---|---|---|---|---|
Alamance | G-010347-14 | BURLINGTON DIALYSIS | Add six dialysis stations for a total of 24 upon completion of this project and Project ID #G-10265-14 (relocate 8) | 01/23/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 386 KB) |
Alamance | G-010352-14 | North Burlington Dialysis | Add three dialysis stations for a total of 14 dialysis stations upon completion of this project and Project ID G-10265-14 (relocate 2) | 01/23/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 387 KB) |
Durham | J-010350-14 | Durham West Dialysis | Add four dialysis stations for a total of 30 upon completion of this project and Project ID #J-10319-14 (relocate 3) | 01/12/2015 | Conditional Approval (PDF, 203 KB) | Findings (PDF, 397 KB) |
Gaston | F-010356-14 | Stanley Total Living Center Inc | Add 12 new NF beds per Policy NH-2 and 30 new ACH beds per Policy LTC-1 | 01/16/2015 | Conditional Approval (PDF, 204 KB) | Findings (PDF, 420 KB) |
Lee | J-010316-14 | Westfield Rehabilitation and Health Center | Relocate 20 ACH beds from A Step From Residential Care facility | 01/27/2015 | Conditional Approval (PDF, 154 KB) | Findings (PDF, 472 KB) |
Lee | J-010335-14 | Carolina Dialysis - Sanford | Add 3 dialysis stations for a total of 36 dialysis stations | 01/23/2015 | Conditional Approval (PDF, 150 KB) | Findings (PDF, 503 KB) |
Onslow | P-010351-14 | Southeastern Dialysis Center of Jacksonville | Add eight dialysis stations(5 via facility need and 3 relocated from Southeastern Dialysis Center - Kenansville) for a total of 33 stations upon completion of this project and Project ID #P-10266-14 (relocate 1) and Project ID #P-10123-13 (relocate 18) | 01/30/2015 | Conditional Approval (PDF, 152 KB) | Findings (PDF, 356 KB) |
Pitt | Q-010328-14 | FMC Care of Ayden | Add one dialysis station for a total of 16 dialysis stations | 01/16/2015 | Conditional Approval (PDF, 203 KB) | Findings (PDF, 351 KB) |
Pitt | Q-010334-14 | FMC Dialysis Services East Carolina University | Add 10 dialysis stations for a total of 41 dialysis stations upon completion of this project and Project ID #Q-10315-14 | 01/16/2015 | Conditional Approval (PDF, 203 KB) | Findings (PDF, 384 KB) |
Sampson | M-010323-14 | Sampson County Home Dialysis | Develop a freestanding home training program for peritoneal dialysis patients | 01/28/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 364 KB) |
Wake | J-010318-14 | UNC Hospitals Radiation Oncology, Holly Springs Campus | Acquire one linear acclerator | 01/28/2015 | Denied (PDF, 148 KB) | Findings (PDF, 768 KB) |
Wake | J-010320-14 | The Prostate Health Center | Acquire one linear acclerator | 01/28/2015 | Conditional Approval (PDF, 151 KB) | Findings (PDF, 768 KB) |
Wake | J-010339-14 | BMA of Fuquay Varina Kidney Center | Add four dialysis stations for a total of 23 dialysis stations upon completion of project | 01/14/2015 | Conditional Approval (PDF, 203 KB) | Findings (PDF, 319 KB) |
Wake | J-010343-14 | Fresenius Medical Care Eastern Wake | Add three dialysis stations for a total of 14 dialysis stations upon completion of this project and Project ID #K-10099-13 | 01/16/2015 | Conditional Approval (PDF, 202 KB) | Findings (PDF, 313 KB) |
Wayne | P-010344-14 | Goldsboro Dialysis | Add one dialysis station for a total of 27 stations upon completion | 01/16/2015 | Conditional Approval (PDF, 202 KB) | Findings (PDF, 357 KB) |